High Volume Transport

Vital transport research to ensure accessible, affordable and climate friendly transport for all.

ORN22 A guide to pro-poor transport appraisal – the inclusion of social benefits in road investment appraisal

PDF content (text-only)

ORN 22: A  G UIDE TO  PRO -P OOR  T RANSPORT  A PPRAISAL   The inclusion of social benefits in road investment appraisal   Overseas  Road Note 22  Published 2004  ISSN 0951-8797    This document is an output from a project funded by the UK Department for International  Development (DFID) for the benefit of developing countries. The views expressed in it are  not necessarily those of DFID.    Subsector :Transport  Theme :T3  Project Title :Overseas Road Note 22: A Guide to Pro- Poor  Transport Appraisal  Project Reference :R8123  The Department for International Development: a brief mission statement    The Department for International Development (DFID) is the UK Government department  responsible for promoting sustainable development and reducing poverty. The central focus of  the Government’s policy, based on the 1997 and 2000 White Papers on International  Development, is a commitment to the internationally agreed Millennium Development Goals,  to be achieved by 2015. These seek to:  Eradicate extreme poverty and hunger    Achieve universal primary education    Promote gender equality and empower women    Reduce child mortality    Improve maternal health    Combat HIV/AIDS, malaria and other diseases    Ensure environmental sustainability    Develop a global partnership for development   DFID’s assistance is concentrated in the poorest countries of sub-Saharan Africa and Asia,  but also contributes to poverty reduction and sustainable development in middle-income  countries, including those in Latin America and Eastern Europe.    DFID works in partnership with governments committed to the Millennium Development  Goals, with civil society, the private sector and the research community. It also works with  multilateral institutions, including the World Bank, United Nations agencies, and the  European Commission.    DFID has Headquarters in London and East Kilbride, offices in many developing countries,  and staff based in British Embassies and High Commissions around the world.    DFID, 1 Palace Street, London SW1E 5HE  DFID, Abercrombie House, Eaglesham Road, East Kilbride, Glasgow G75 8EA  Tel: +44 (0) 20 7023 0000  Fax: +44 (0) 20 7023 0019    Public Enquiry Point: 0845 300 4100 (from outside the UK: +44 1355 84 3132)  DFID website: www.dfid.gov.uk Email:  enquiry@dfid.gov.uk ACKNOWLEDGEMENTS    This ORN was drafted by a team consisting of Jeff Turner, Phil Fouracre, Deborah Bryceson  and Annabel Davis (TRL Limited); Gary Taylor and Farhad Ahmed (IT Transport); JB Odoki  (University of Birmingham).    It has benefited from a series of workshops held in Bracknell, Kunming and Addis Ababa, at  which participants were invited to present ideas, views and contributions. At the first of these  workshops, a group of invited experts were invited to present commissioned papers that  addressed various aspects of the social impact of roads. These papers can be viewed at  www.transport-links.org .Also as part of the preparation of this work, field surveys were  undertaken in Viet Nam, Zambia and Ethiopia by the Transport Development and Strategy  Institute (TDSI), RuralNet Associates and the Ethiopian Roads Authority respectively.      OVERSEAS ROAD NOTES    Overseas Road Notes are prepared principally for road and transport organisations in  developing countries. A limited number of copies are available to other organisations and to  individuals with an interest in road management, and may be obtained from:    Centre for International Development  TRL Limited  Crowthorne House  Nine Mile Ride  Wokingham  Berkshire, RG40 3GA  United Kingdom  www.trl.co.uk    Limited extracts from the text may be reproduced provided the source is acknowledged. For  more extensive reproduction, please contact TRL using the postal or website address above.    Foreword    Rural transport investment has an important role to play in the eradication of poverty and  achievement of the Millennium Development Goals. It provides opportunity for isolated  communities to access health, education, trade and social networks. It provides a gateway to  unknown opportunity and for other service delivery components to be realised.    While these types of benefit from investment in rural transport are seemingly obvious and  worthwhile, their valuation for inclusion in conventional appraisal processes is problematic.  These social benefits do not lend themselves easily to economic quantification in the same  way as more ‘conventional’ road benefits (like improved vehicle productivity and time  savings). And yet in the rural context, traffic levels are very low, and the sum of these  ‘conventional’ economic benefits is unlikely to justify road investment.     Evidently, the inclusion of social benefits in rural transport appraisal is necessary if  appropriate and positive investment decisions are to be made. But this needs to be done in a  consistent and transparent way at all levels in the process of allocating funds to road  investment.       This ORN addresses these issues; it identifies the nature of social benefits, how they can be  measured using indicators, and how they can be included in the appraisal process for rural  transport. A software ‘add-on’ to include social benefits with HDM4 is also described. The  document also emphasises the need for process, and as part of the process, the participatory  inclusion of the end-users of rural roads and transport services – rural communities.     The document is primarily targeted at those engaged in the appraisal of roads, but it will also  be of value to other stakeholders who should be involved in the process of road-fund  allocation.     Peter O’Neill  Central Research Team  DFID    CONTENTS  1 I NTRODUCTION ....................................................................................................... 1  1.1   The importance of Social Benefits ........................................................................... 1   1.2   Purpose of Guidelines .............................................................................................. 1   1.3   Target Audience ....................................................................................................... 2   2 C URRENT  APPRAISAL  M ETHOD ............................................................................ 4  2.1   Cost-Benefit Analysis .............................................................................................. 4   2.2   The Case for a New Approach to Rural Transport Appraisal .................................. 5   2.3   The Valuation of Generated Traffic ......................................................................... 6   2.4   Project versus Strategic Level Analysis ................................................................... 7   2.5   The Problem of Double – Counting ......................................................................... 7   3 I DENTIFYING  SOCIAL  BENEFITS ............................................................................ 9  3.1   What are Social Benefits? ........................................................................................ 9   3.2   At what Level do Social Benefits Arise? ............................................................... 10   3.3   Impact of Transport on Social Benefits ................................................................. 10   3.4   Transport and Poverty ............................................................................................ 12   4 M EASURING  SOCIAL  BENEFITS OF  TRANSPORT ................................................. 14  4.1   Outline.................................................................................................................... 14   4.2   Methodological Approach...................................................................................... 15   4.3   Creation of a Study Team ...................................................................................... 16   4.4   Survey Reconnaissance Procedure......................................................................... 16   4.5   Key Informant Surveys: ......................................................................................... 16   4.6   Focus Groups and Questionnaire Surveys ............................................................. 17   4.7   Analysis of the Data ............................................................................................... 19   5 I NCORPORATING  SOCIAL  BENEFITS INTO  TECHNICAL  APPRAISAL OF  ROADS .20   5.1   Introduction ............................................................................................................ 20   5.2   Social benefits software tool - methodology.......................................................... 20   5.3   Analysis and Outputs ............................................................................................. 25   5.4   The operation of the HDM-4 model....................................................................... 25   5.5   Prioritisation in HDM-4 ......................................................................................... 26   5.6   Linking the Social Benefits Software Tool to HDM-4 .......................................... 27   5.7   How to use the Social Benefits Software as a Stand Alone Tool........................... 27   6 T HE  PROCESS OF  PRIORITISATION : A P ARTICIPATORY  APPROACH TO  TRANSPORT  APPRAISAL .............................................................................................. 29  6.1   Introduction ............................................................................................................ 29   6.2   Principles................................................................................................................ 29   6.3   Participatory goal setting at the Macro Level ........................................................ 30   6.4   Meso Level Participatory Option Development..................................................... 31   6.5   A Micro-level participatory Road Funding Prioritisation Approach ..................... 32   7 R EFERENCES ........................................................................................................ 36  APPENDIX 1 – Q UESTIONNAIRE  A:  KEY INFORMANTS   37  APPENDIX 2 – G UIDANCE NOTES FOR FOCUS GROUP DISCUSSIONS   45  APPENDIX 3 – Q UESTIONNAIRE  B:  HOUSEHOLD QUESTIONNAIRE SURVEY   54 APPENDIX 4 – M APPING AND  RANKING  EXERCISES   62 1 1 I NTRODUCTION   1.1 T HE IMPORTANCE OF  SOCIAL  BENEFITS    This Overseas Road Note provides guidance on incorporating social development concerns  into rural transport appraisal. These concerns need to be included in order to:      Emphasise the role of rural roads as a major factor in addressing  poverty    Enhance their potential for selection against investment projects in  ‘competing’ sectors.     The changing development context. There is an increasing need for donor agencies and  national governments to be able to justify investments in transport, as in any other sector, in  terms of their contribution to the alleviation of poverty. There has also been an increasing  trend towards highlighting the benefits of investments in all sectors in terms of the non- pecuniary impact upon social networks and low-income households’ ability to survive. At the  macro (national policy) and meso (national and regional government institutions) levels, there  is also a need to assess the way in which social benefits are currently accounted for, and what  measures are used to weight them in strategic planning across sectors.     The need for road investment appraisal to reflect the new development agenda.  Improved  rural roads and transport are recognised by many stakeholders as vitally important to the  alleviation of poverty in developing countries. However, current transport investment  prioritisation processes do not reflect this contention and instead focus on a very narrow set of  benefits (from road investment) which are frequently insufficient to justify the proposed  investment. Thus there is a need to better represent the wide and significant range of impacts  that improvements in transport conditions have on rural communities, particularly on the poor  and disadvantaged.    The need for decisions to be made in a transparent manner that promotes good governance.   A key starting point for delivering infrastructure and services for pro-poor growth is the use  of transparent processes of investment appraisal. This requires the use of standard economic  techniques, for which government capacity can be built, together with stakeholder  involvement to test technical assumptions and to render governments accountable. Poor  people’s perspectives need to be integrated, either through official representation, as with  parliamentary oversight committees, or through independent, direct external monitoring  (DFID, 2003). Processes should be participative, and include the voice of people often  neglected in traditional transport investment appraisal such as women, low-income  communities and young people.  1.2  P URPOSE OF  GUIDELINES    This document describes an approach to transport appraisal within the new development  context, by presenting:     Aframework for the inclusion of social benefits in technical appraisal of rural  transport investment    Guidelines for the application of this framework    Its use with existing planning tools such as HDM-4   Guidelines on an appraisal process that is participatory and inclusive.    2 The aim is also to promote the development of a transparent, multi-layered and integrated  pl anning process for rural transport investment which will equally inform macro-level budget  allocation decisions, meso-level regional screening exercises as well as micro project  appraisal exercises.     Finally, this document identifies good practice in the process of fund allocations and provides  guidance for a varied audience from central government policy-makers and aid agency staff to  managers of road organisations and local engineers as well as local communities and local  authority representatives.    The structure of the guidance document is set out in Figure 1. Essentially the Overseas Road  Note is in two parts:   An examination of the nature of social impacts, their measurement and inclusion in  the technical appraisal process (Chapters 3 - 5),     A recommended process for involving stakeholders in the overall process of  resource allocation within the roads sector (Chapter 6)     By way of introduction, Chapter 2 of the Overseas Road Note examines the nature of  conventional cost-benefit analysis as applied to rural transport appraisal, and highlights the  problems being encountered and hence why there is a need for a wider approach.   1.3  T ARGET  AUDIENCE   This document is targeted principally at transport specialists involved in the process of  informing decisions on investments to change rural transport conditions. It assumes a basic  level of knowledge concerning the theory and application of Cost-Benefit Analysis (CBA) in  road appraisal. It also assumes that the reader has some understanding of the role (though not  necessarily the application) of design, appraisal and management tools, and specifically the  Highway Development and Management suite, HDM-4.     In guiding planners towards robust appraisal, it will also help to establish a better-informed  process, which takes regard of all stakeholders. Thus it sets out how:     Local communities can be involved in decision-making about their local road  network     Road managers and others responsible for the condition of transport provision in  rural areas can set up participative and transparent processes to help them prioritise  road investment    Local authorities can compare decisions about investments in rural transport  conditions with other poverty reduction options    Donor staff and senior national decision-makers (both within the transport sector  and other sectors) can examine the contribution that rural transport investment  makes to poverty reduction relative to other potential investments.    In some countries where the political context has maintained a need for social as well as  economic considerations, social benefits have often been included implicitly in rural transport  planning. But with the changing focus of attention (from strict economic efficiency to wider  poverty equity issues), all countries will need to engage in the debate, or face a continual  erosion of investment resources in rural transport (that cannot be justified on traditional  grounds).     The changing context also supports a move away from purely project level planning for  resources, to more integrated, strategic programme planning of which project appraisal is only  part.  As a result, the guidance in this document assumes that at the macro and meso levels,  3 there is also a need to assess the way in which social benefits are currently accounted for by  na tional government and local authorities, and what measures are used to include them in  strategic planning across sectors.     Figure 1: The structure of the guidelines    Chapter 1Why it is important to include social  concerns in road appraisal and what is the  purpose of the Guide?  Chapter 2What is current practice in road appraisal  and what is wrong with it?  Chapter 3What are social benefits?  Chapter 4 How should social benefits be measured?  Chapter 5How should social issues be included in the  technical appraisal of projects and the  allocation of funds between road  investment options.  Chapter 6How should social issues be included in the  participatory appraisal of projects and the  allocation of funds between road  investment options.  4 2 C URRENT  A PPRAISAL  M ETHOD    2.1 C OST -B ENEFIT  ANALYSIS   Traditionally, Cost-Benefit Analysis (CBA) is employed to assess the economic worth of a  road investment, which is judged over its life-time using the discounted values of all current  and future flows of costs and benefits associated with the project. The project is judged on the  basis of comparing the costs of having the project (the ‘with’ case) as against a base case of  ‘doing nothing’ (or doing the minimum – the ‘without’ case).     In principle, all impacts of road development can be captured by economic theory, and hence  included in a CBA. In practice, the valuation of many of the impacts is beyond the scope of  current economic valuation tools. Thus CBA has tended to focus on so-called ‘economic’  benefits, which are those that can be valued in money terms. In this context, the non- quantifiable benefits are often referred to as social benefits and/or environmental benefits  (which in turn are sometimes referred to as Kyoto-type benefits, which are the largely non- quantifiable impacts on resource sustainability and emission levels). The division between  these so-called economic, social and environmental impacts is often blurred.    In practice, therefore, in a traditional CBA, the benefits and costs from a road project are  typically confined to a series of discrete categories which can be quantified in money terms.  These are:     The initial costs of the road investment (rehabilitation, new construction, etc)   The direct savings in the costs of operating vehicles on the new road   Economies from reduced road maintenance requirements   Time savings incurred by travellers and freight   Resource savings generated from reductions in road accidents   Wider effects on the economic development of a region from changes in transport  conditions (while ensuring that these impacts have not already been captured in any of  the above categories)    Non-quantifiable impacts are often assessed in a qualified manner, and the CBA may be  modified to present option rankings (either in simple form, or in some form of multi-criteria  or framework analysis). Many environmental impacts can be assiduously estimated, and in  many cases roads will need to be designed to meet stringent environmental standards. In the  case of ‘social’ impacts, there is less clear-cut understanding of impacts, and hence little or no  attention is given to this category.      For high-volume roads that provide long-distance, inter-urban transport for people and goods,  direct savings in the costs of operating vehicles over the new roads will be the most  significant benefit. In urban environments, time savings are usually the most significant  benefit of road investment. For all such investments, CBA provides a robust appraisal tool  which is likely to yield (assuming favourable conditions and appropriate project design)  acceptable rates of return by comparison with the benchmark across all sectors.    For low-volume rural roads, by contrast, economic justification for changes in transport  condition rests mainly on the impact on local economic development, manifesting itself in  extra, generated traffic. However, there are problems with current appraisal methods for  estimating and valuing generated traffic 1, and as a result the rates of return on low-volume    1The standard procedure is to take half the value of benefits to generated traffic (refer to Section 2.3  for a full explanation)   5 rural roads are often insufficient to justify expenditure compared to other public investments.  T hese problems occur because current appraisal methods assume:    a)  That market (or economic) prices should be used to allocate resources.    b)  That people have sufficient cash reserves to travel.    c)  That there are no major changes in modal split (e.g. from walking and pack  animals to vehicles).    d) There are no major changes in the nature and form of access (i.e. road closure is  not an issue in either the “with” or “without” investment case) – though this may  be the precise reason investment to change rural transport conditions may be  under consideration.      e)  That there is confidence in the ability to predict traffic growth.    f)  That normal traffic (i.e. traffic that would occur both with and without the  investment) represents a satisfactory measure of the major component of total  benefits – even though the absence of ‘normal’ traffic to remote rural areas may  be why investment in changing rural transport conditions is under consideration.    g) There are no major externalities involved (i.e. there are no longer-term impacts  from changes in rural transport conditions, such as substantial change in rural  lifestyle, major impacts on the sustainability of rural livelihoods, long-term  impacts on local environment through land-use changes, etc).    h) That all resources (including government agencies providing health care,  education and extension services) are employed up to the point at which marginal  benefits equal marginal opportunity costs.    Current estimates of the value of generated traffic do not represent accurately the importance  of improved transport conditions to isolated communities, or the real long-term effects of  significant changes in accessibility to rural communities.  2.2  T HE  CASE FOR A  NEW  APPROACH TO  RURAL  TRANSPORT  APPRAISAL   In many cases in remote rural areas without road access, the assumptions above do not hold.  (For example see Box 1). The case for a different approach is strongest where a remotely- located large population makes relatively few trips and the only access is via a poor access  footpath, road or track; where this access is liable to be severed or disrupted, possibly for  several months of the year, vehicle movement may be prevented and mobility constrained.  Issues that should be considered include:        From the perspectives of both personal security and the need for vehicle access in a  medical emergency, there is an important psychological benefit of all year round  vehicle access even if emergency trips are rarely made    If a road is cut then it is likely that normal marketing activities in the area will  either cease or be severely curtailed. Longer, more circuitous walking trips can be  expected    While government services and external agencies remain crucial to the  development of an area, there are strong arguments for reasonable all year round  vehicle access to major centres within each local district  6  Any external institution (commercial, government, NGO etc) planning to locate  staff and facilities in a remote location will think twice if vehicle access is very  poor and cannot be guaranteed throughout the year.      Box 1. An example of failings in current appraisal methods  T ake an extreme case where a new road is being introduced to a remote poor community where in the  ‘without’ case people have to walk twenty kilometres and carry sick relatives to hospital, but in the  ‘with’ case they can travel (perhaps very intermittently) by motor vehicle. Trip purpose does begin to  matter, for it can be a matter of ‘life or death’. The valuation of transport cost savings, based on either  normal traffic (the difference in the opportunity cost of walking versus vehicle operating costs) or  generated traffic (involving half the transport cost difference) looks distinctly odd (Hine, 2003).   It is also impossible to capture the long-term impact of improving accessibility (through the  conventional measurement of normal, diverted and generated traffic benefits) when this has a  direct impact on the location of important facilities. Perhaps correctly, new road investment in  rural areas of developing countries is often seen as the precursor of many other interventions  including schools, clinics, water supply, government offices, NGO activity and commercial  investment.      As well as theoretical difficulties, there are also other problems in the practice of using  conventional methods for assessing rural transport. Some of these relate to the systematic  exclusion of certain benefits, the faulty measurement of the benefits that are included and the  failure to recognise that the assumptions needed to justify ignoring distributional impacts –  and so focus solely on efficiency gains – do not hold in practice. In essence these problems  refer to the capacity available within national road and transport ministries and within local  authority planning departments to use such investment appraisal techniques.   2.3  T HE  VALUATION OF  GENERATED  TRAFFIC   Perhaps the biggest weakness of conventional CBA is the valuation of generated traffic  benefits. ‘Normal’ traffic represents that which would exist both with and without the  improvement; the benefits are calculated by multiplying this by the change in transport costs  per trip. In most circumstances where the means of travel used and the nature and purpose of  the trips made will not change, this measure of benefits is reasonable. Generated traffic  benefits are traditionally valued as the predicted increase in traffic multiplied by half the  difference in transport costs. If the market economy works well (i.e. there is perfect  information, and cost and benefits are internalised by each stakeholder), this may be a  reasonable assumption particularly where only marginal changes in transport costs and  accessibility are envisaged.  However the valuation of ‘half’ the difference in transport costs  could well be a gross underestimate of the effects if the new trips that are generated lead to a  step change in the social and economic life of those concerned. If the change in accessibility  brings about a dramatic change in the amount of rural mobility, a change in how people travel  or acts as a new activity generator (e.g. a school, clinic, water supply project, market or an  externally funded new agricultural investment) the benefits to the local population may have  very little to do with the predicted increase in the volume of trips made and may bear virtually  no relationship to the valuation of half the difference in transport costs.    When there is poor accessibility (particularly when vehicle access does not exist or is  threatened) and there is a low level of personal trip, the conventional measure of transport  cost savings (particularly for generated traffic) is an unsatisfactory measure of benefits. In  such cases the marginal assumptions break down.  7 2.4 P ROJECT VERSUS  STRATEGIC  LEVEL  ANALYSIS   There is also a question of which level and what stage should appraisal be undertaken. There  are three recognised ‘levels’ involved in the decision-making process connected to changing  rural transport conditions. These are:   Macro-level, where national budgets are set and decisions need to be taken as to the  allocation of resources to the transport sector  vis-à-vis other policy sectors, by region and  by modes and category of roads     Meso-level where decisions are taken about resource priorities such as which transport  modes and which areas of regions are to be given greater priority.     Micro-level, where, within pre-defined resource constraints set at higher levels,  alternative projects to change transport conditions are examined, and decisions taken  about the best scheme option.    Traditionally, CBA is undertaken at the micro or project level, once resources have been  allocated from central organisations to intermediate or meso level organisations to distribute  throughout their geographical areas.     Analytical tools like HDM-4 have the capability for examining ‘higher level’ resource  allocation issues, but in general the processes of resource allocation lack transparency and  accountability. The degree to which resources are allocated on the basis of observed  variations in poverty or the level of public involvement in the criteria for distributing  resources needs to be examined. There is therefore a need for any technical process of road  appraisal to be incorporated in a process of decision-making that involves a wider set of  stakeholders than are able to understand and interact with a technical planning exercise such  as cost-benefit analysis. Their priorities and experiences need to be incorporated in a  systematic manner into the decision process.     These Guidelines set out a process for decision-making on resource allocation to support  changing rural transport conditions. It sets out methods involving analytical tools that can be  used to determine efficient allocations of resources based on a series of objective criteria,  including social benefits. The guidance also presents options for developing greater public  participation and transparency in the decision-making around the allocation of resources  between central financial institutions and sector-based organisations, such as national and  regional roads authorities.    Thus as well as presenting the techniques for including social benefits in appraisal tools, it  also provides a process for strategic decision-making in the allocation of resources between  roads which allow the user of this guidance to adopt and develop an approach appropriate to  the context and structure within which they work.  2.5  T HE  PROBLEM OF  DOUBLE  – C OUNTING   It is useful to identify the benefits from road investment as either primary or secondary  benefits. The primary benefits are the directly measurable ‘first round’ traffic related effects.  Examples of primary benefits include transport cost savings or accident cost savings.  Secondary benefits arise at a later stage and include changes in land values or the wider  economic development generated from the investment. Secondary benefits are very difficult  to isolate and measure; in addition it would involve double counting to add primary and  secondary benefits together. For example, in theory, reduced transport costs will directly  induce a rise in land values; to add changes in land values to transport cost savings would  involve double counting.  8 In general, the more competitive and less distorted an economy is, the more likely it is that the  p rimary traffic benefits will cover the full consequences of a road investment. The arguments  for introducing secondary benefits into the analysis are strongest in the following  circumstances:   For remote new rural road investment   Where a relatively large change in transport costs are anticipated    Where there are unemployed resources    The local economy is perceived to be uncompetitive and weak      Social benefits, as described in the next section, are very much part of secondary benefits.  Any analysis that includes social benefits has to be wary of the possibility of double-counting  and appropriate action should be taken to resolve the problem.    9 3 I DENTIFYING  SOCIAL  B ENEFITS    If social benefits are to be included in rural transport appraisal, the key questions that need to  be addressed are:    What are social benefits?    At what level do social benefits occur (macro, meso or micro levels)?    How are social benefits affected by changes to transport conditions?    How do the social benefits from changes in transport conditions affect poverty?    In examining these issues, it is worth remembering that social impacts that are derived from a  road project can be negative (i.e. a social cost) as well as positive. This Guide tends to focus  on beneficial social impact, but any analysis should also identify and account for possible  adverse impacts.    3.1  W HAT ARE  SOCIAL  BENEFITS ? Social benefits are a wide range of multi-dimensional, interactive and complex non-economic  benefits that arise from changes in transport conditions. These include such things as  improved social networks and enhanced social capital that are acquired by maintaining links  with family members outside of the immediate rural area; improved health and education  through easier access to services, particularly with regard to maternal mortality and girls  education; improved service delivery by clinics and schools and associated staff attendance.     Due to their complexity and the variety of possible benefits that may arise from person to  person and context to context, social benefits are what local communities and users of  transport perceive them to be, depending on their own experience and context. And hence, to  determine the social benefits of a particular transport project requires the involvement of local  communities, transport users and decision-makers in defining and assessing the likely impact  on them (the social concerns) of the proposed project.    In a more generalised way, social benefits are the wide range of benefits that are connected to  the way households and communities respond to changes in transport conditions (resulting  from the transport project) that are not covered by the narrow boundaries of vehicle operating  cost and travel time savings. Box 2 gives an example of a list developed from a USAID study:     Box 2:  Beneficial social impacts of rural road construction and improvement of existing roads  Social change   Increased national identity;   Improves government-village relations.  Impact on women   Provision of roads found to be liberating, providing them more opportunities, more choice and  freedom from restraints of traditional society.   With roads constructed by labour-based methods, increased employment opportunities.  Health and nutrition   Enable inhabitants to reach health clinics and personnel more easily.  Education   Rural roads enable more children to attend classes more easily and smaller more isolated  communities to retain teachers.   Associated with the construction of additional schools.  Migration   Strengthening of local market towns as administrative and economic centres.  Perceived quality of life   Represents progress and provides visible benefits immediately.   Rural communities view roads favourably.  (Source: U.S. Agency for International Development, 1982)  10 3.2 A T WHAT  LEVEL DO  SOCIAL  BENEFITS  ARISE ? An analysis of the social benefits of programme and project interventions should be set firmly  within the wider contexts of national macro-economic and transport sector policy. To  adequately integrate social benefit analysis into any transport sector investment programme, it  is necessary to consider both:     The implications of macro-economic and transport sector policies on social  relations; and   The impact of social relations upon the whole transport sector analysis and its  policy options     Therefore the analysis of social benefits (connected to interventions to change rural transport  conditions) should not just be constrained to micro-project level interventions but should also  be reflected in the work of:      Meso-level organisations (e.g. Regional Road Departments and transport operators)  and how they decide rural transport priorities and operating practices   Macro-level institutions (Government Ministries and other national transport  policy groups) and the importance they place upon investing changes to rural  transport conditions.    Box 3:  Example of approaching gender relations within social benefits analysis   It is important to examine the ways in which gender relations, gendered norms, and gender imbalances  affect performance, priorities and impacts throughout the transport sector. This involves recognising  that:    The transport needs of men and women can be different   Men and women have different capabilities to participate in the design and delivery of  services   Institutions which design, deliver and evaluate sector programmes operate according to  rules and norms which are gendered, i.e. they normally function in ways which prioritise  men’s needs and viewpoints over those of women.   In this case, the whole transport sector should be viewed as a ‘gendered structure’. Seemingly gender  neutral’ institutions may, in fact, be gender-biased by causing unintended consequences for the way in  which households organise themselves, and who takes responsibility for the subsistence and  reproductive burdens within the household. Unforeseen adverse impacts on household operations can  have negative implications for a wider, commercially-oriented market economy, leading ultimately to  an overall reduction in effectiveness of donor-supported investment.  Box 3 gives an example of a macro-meso-micro level structure. The analysis of social  benefits should also focus on how these different levels are inter-related and inter-connected,  establishing for example:     What role national policy plays in a local transport project and vice versa?    How do the rules and practices of a Regional Roads Department influence the  design of transport investment and what impact does this have on rural  communities’ lives?    3.3  I MPACT OF  TRANSPORT ON  SOCIAL  BENEFITS   By its very nature of providing access and mobility to a range of activities and opportunities,  transport must inevitably have a social impact which is likely to be profound. Social  movements cover (amongst others) trips to health centres, hospitals, schools, government  11 offices and to visit friends and relations. They are important because they strengthen the  s ocial capital of the individual and may help in personal or community crisis.     The argument for separately introducing ‘social’ benefits is strongest when roads become  impassable to motorised traffic. When this happens whole communities may be cut off from  conventional social services and hence personal trip making will be severely curtailed.  Conventional economic analysis of road investment relies heavily on vehicle traffic  movements in the estimation of transport benefits. If roads are impassable or suffer from  strong traffickability problems, then clearly a measure based on existing traffic volumes alone  will underestimate the benefits from road improvement. Even though it is possible, under the  conventional analysis, to predict generated traffic and value the associated benefits it can be  argued that when roads are cut off (and people directly denied access to critical services) this  procedure is faulty and unlikely to give a reasonable estimate of the benefits of re-establishing  access.    Research undertaken by TRL has highlighted the impact of changes in transport conditions  upon rural communities. This work has highlighted a series of examples where positive and  negative social impacts have been reported (See Box 4 for an example).     Box 4: Impact of changes in transport conditions on social conditions of rural community in  Zambia  First year after the road intervention   Positive   The food supply had improved    Flooding reduced because proper drainage system was set up   Traffic on the road increased, with more bicycles and motor vehicles passing along the road  The increase in traffic on the road led to construction of small stores along the road  Negative   Because of the increase in traffic there was too much dust causing pollution   Because of the traffic people are disturbed with the noise  In the second year  Positive   More vehicles, including passenger buses had started coming to the area to provide transport   It started becoming easier for people to trade freely because more traders from outside were  coming to the area to buy agricultural products   Generally, cleanliness in the settlement improved  Negative   Because the road was now in a good state, people had started over speeding causing road  accidents especially among children  Since last year   Positive   Food security has improved in the area   The road has promoted agricultural activities   Accessing places of importance such as the grave yard has been easier   There are more trading activities in the area  Negative   Because of heavy-duty vehicles coming to buy produce from the farmers, the road is getting  damaged in some parts  12 3.4 T RANSPORT AND  POVERTY   The World Bank (2000) describes poverty in terms of four dimensions:     Opportunity.  Poverty is expressed in a lack of access to labour markets, employment  opportunities and to productive resources, constraints on mobility, and, particularly in the  case of women, time burdens resulting from the need to combine domestic duties,  productive activities, and management of community resources. Transport contributes to  economic growth by mobilizing human and physical resources. Improved productivity  and output helps to “lower transaction costs, allow economies of scale and specialization,  widen opportunities, expand trade, integrate markets, strengthen effective competition  and eventually increase real income and welfare of society. Without efficient transport,  economic growth is not possible, and without growth, poverty reduction cannot be  sustained” (Gannon and Liu, 1997). As well as contributing to growth, transport also  provides access to employment opportunities.     Capability.  Poverty is expressed through a lack of access to public services such as  education and health, and hence an inability to build human capabilities. Transport can  contribute to developing human capital and quality of life. Transport can play a big part  in improving this attribute of poverty by providing access to education, health-care  facilities etc. This constitutes access to the opportunities and means to improve human  capital.     Security.  Poverty is expressed as vulnerability to economic risks and to civil and  domestic violence. It reflects the vulnerability of the poor to the uncertainties of life  (particularly the vulnerability of the poor to sudden shocks), and the ways in which they  cope. Transport should contribute to greater security by removing any sense of  vulnerability through isolation. Transport is also a source of vulnerability in that it  provides a location and environment for harassment.    Empowerment. Poverty is expressed as being without voice and without power at the  household, community, and national levels to influence decisions made that affect ones  livelihood. The dimension of poverty that reflects the need (and inability on the part of  the poor) for participation and inclusion in all the political and social processes and  networks. Transport is a mechanism for supporting effective participation.  It is clear that changes in transport conditions will have a series of impacts and benefits upon  these four dimensions of poverty; Table 1 sets out examples of such impacts. The Table  indicates the three main categories of benefit (economic, social and environmental), and  shows that changes in transport conditions will bring not only monetary benefits but also  environmental and non-monetised or social benefits. It will only be possible to develop a  complete and appropriate list of all benefits associated with a particular scheme to change  transport conditions with the involvement of local decision makers and local communities.    13 Table 1: Impact of benefits on poverty dimensions Impact on: Cost/benefit of road improvement Money valuation of benefits (costs) Economic opportunity Capability Security and isolation Empowerment Comments Road maintenance Road deterioration relationships and unit maintenance prices Increased marketing and income generation opportunities Enhanced emergency access to health services and continuous access to education Reduced isolation Enhanced mental well- being Reduced exposure to vulnerability from ill- health Enhanced ability to participate in civil society decision- making Vehicle maintenance Vehicle wear relationships and spare part prices Increased output/ productivityEnhanced profitability for public transport services increases access to services networks and opportunities Enhanced safety of vehicles will reduce vulnerability and shocks caused by road accidents Journey time changes(existing traffic) Speed-flow relationships and valueof time Access to employmentIncreased output/productivity Reduced time burdenon women and childrenthat can be utilised forimproving quality ofhousehold care andmanagement socialnetworks Reduced isolation.Enables bettermanagement of ill-health and economicshocks for household. Reduced time burdenof household andincome-generatingtasks enables greatercontrol of time forwomen and children Main economic benefit of roadimprovement (value of time andtime saved are proxies for economicgrowth). Adding in other benefits(impacts) may be double counting. Lower travel costs generatemore travel Forecast travel change and changein travel price Access to employmentIncreased output/productivity Enhanced ability toaccess health andeducation services andsocial networks Enhanced ability tomanage economicshocks through accessto social networks andoutside help More opportunity forinteraction withdemocratic process/family networks andsafety nets/ Problem of ‘step-change’improvements – forecasting thechange is problematic. Hence thecase for assessing ‘social’ impacts,based on analysis of expectedchanges in livelihood. Economic  benefits  Road accidents Road design-accident relationshipsand values of life/injury Impact on familyearning potential/household budgets. Greater benefit frominvestments in humancapital such asschooling Reduced vulnerabilityand risk of shocksfrom accidents Severance Impact on access toemploymentopportunities Impact on access tohealth and educationservices Impact on household’svulnerability fromshocks and use ofsocial networks tomanage shocks Impact on interactionand co-operationbetween communities Probably of more concern in urbanenvironments. Social benefits  Resettlement Compensation payments Impact on access toemployment, naturalresources etc Impact on access tonatural capital(firewood & water) Impact on socialnetworks may increasevulnerability Process of decision toresettle may affectcommunity cohesionand perception ofpower Environmental benefits  Emissions (noise and pollutants) Impact on health 14 4 M EASURING  SOCIAL  B ENEFITS OF  T RANSPORT    4.1 O UTLINE   As has been set out earlier in Section 3, social benefits are a wide range of multi-dimensional,  interactive and complex non-economic benefits that arise from changes in transport  conditions. Findings from case studies undertaken as part of the development of this Overseas  Road Note suggest that social benefits from changes in rural transport conditions can be seen  as:     Improved social networks and enhanced social capital from people finding it easier to  maintain links with family members outside of the immediate rural area. Such links  provide for social interaction and access to help and resources in times of need.    Enhanced community development may arise from the community working together to  maintain or improve their own transport conditions. This depends upon how changes in  transport conditions are brought about and how they are maintained.   Increased confidence in an ability to travel to access services and opportunities.   Improved health and education through easier access to services, particularly in areas  such as maternal mortality and girls’ education.   Reduced vulnerability to unexpected events and shocks from crop failure, accidents and  poor security. This is often due to an increased ability to access assistance and to secure  income from an alternative source.    Greater reliability of clinics and schools in securing secure staff for clinics and schools  and easier to maintain these services because drugs can be supplied and school supplies  replenished.   Reduced time burdens from engaging in mobility due to the improved environmental  impact of roads (e.g. less dust) and increased transport service frequency.     The social benefits of changes in transport conditions are best measured with the use of proxy  indicators. These indicators are based on participatory enquiry which seeks to estimate a  community perspective of how transport influences their lives and livelihoods. However,  from the case study research undertaken as part of the development of this guidance, a set of  indicators (as set out in Table 2) could include the following, derived from consultations with  communities in Vietnam, Zambia and Ethiopia:    Table 2: Possible indicators for social benefits    Social benefit  Possible Indicators  Increased access to education services   Number of schools (primary and secondary) per 100  children in each settlement   Enrolment into primary and secondary school (proportion  of children)   Actual attendance at school (frequency)   Distance to primary and secondary school and tertiary  college   Cost of attending school (transport and school fees)   Literacy rates  Increased access and use of health  services   Distance to health facilities (health post, local clinic,  hospital)   Number of health facilities (health post, local clinic,  hospital) per 100 people in each settlement   Attendance at health facility (frequency)   Cost of attending health facility (transport and medical  fees)   Life expectancy  Greater access to income and   Proportion of expenditure on social/transport activities  15 marketing opportunities (well-connected compared to remote rural settlements)   Economic growth measured by improved living standards  and income/expenditure   Access to/ownership of transport means by income group    Acquisition of credit – proportion of trips and cost of  journeys to community associations   Unemployment rates  Improved transport and mobility  services   Transport fare per km   Proportion of expenditure on transport   Proportion of sample that commute to work and commuting  time    Improved mobility    Distance to transport pickup point   Passability during wet/dry season   Transport fare per unit of goods   Cost of fuel per litre  Enhanced social networks and  improved social capital   Proportion of expenditure on social activities by income  group   Distance to social activities   Frequency of social trip-making   Cost per km of social trips   Number of places of worship per 100 people in each  settlement   Proportion of social visits undertaken by  men/women/boys/girls    Access to/ownership of communication means, by income  group   Rate of migration to/from settlement   All of these indicators should be disaggregated by gender, age and income wherever possible.  4.2  M ETHODOLOGICAL  APPROACH   In order to identify perceived and actual social benefits for individual cases, and to undertake  consultation and sensitisation of local communities for defining and assessing road appraisal  options, it is advised that a robust methodological approach be adopted for measurement of  social impact.      The measurement of the social impact on the range of stakeholders listed below should follow  aseries of clear steps which are:     Creation of study team   Survey reconnaissance   Surveys of key informants   Focus group and questionnaire surveys   Analysis    To measure the social impact within a settlement of changes in transport conditions, the  following stakeholders should be assessed:    a)  Transport user   b)  Livelihood earner  c)   Residents within the settlements living by or near the transport improvement   d)  Community service user   e)   Community service provider (school teacher, health worker, religious leader,  local government official)  16 4.3 C REATION OF A  STUDY  TEAM   The team leader should construct a survey team that includes expertise of a sociologist, an  economist, and an engineer, preferably with specialist knowledge in the field of transport.  Post-graduate qualifications are desirable. In addition, three university graduate survey  enumerators are recommended. The tasks of each are as follows:    1) Team leader    Selection of study areas    Liaising with local officials    Local-level interviewing of key informants   Finalisation of background contextual reports on the area     2)  Two specialist team members (together they should cover the disciplines of  sociology, economics and engineering)   Compilation of contextual background reports on the case study areas based on  data provided by local-level key informant interviews and secondary data  collection from official documents, census data, household budget surveys,  agency reports, and published case studies.   Survey enumeration   Analysis of survey data    3) Survey enumerators  Administering survey questionnaires and helping with the focus group discussions  and participatory appraisal exercises   4.4 S URVEY  RECONNAISSANCE  PROCEDURE   This step should be desk-based and features gathering secondary sources and existing  information on the social characteristics of the communities involved. The types of  information should include:    1) Maps of anticipated catchment area of transport improvement    2)  Latest detailed census and household budget data of the area    3) Background information from various sources (including government, donors, NGOs  and academic sources) on transport infrastructure, services and conditions in the area;  and in particular    4) Survey material relating to the area including household and transport surveys,  participatory mapping etc.  4.5  K EY  INFORMANT  SURVEYS : Key informant interviews should be held with each of the community service provider  categories to provide accurate information on socio-economic characteristics of the  community (see Questionnaire A, Appendix 1). The community service providers include, but  are not limited to:    school teachers    health workers    religious leaders    local government officials  17 4.6 F OCUS  GROUPS AND  QUESTIONNAIRE  SURVEYS   The community service providers should be asked to help in organising separate focus group  discussions with the following demographic groups that may be disaggregated further to  account for age differentials:      Adult women      (aged 18 to 30 / 31 to 45 / 46 to 60)   Adult men        (aged 18 to 30 / 31 to 45 / 46 to 60)   Secondary school students     (aged 12 to 18)    Each group should number about 30 people (for guidelines on how to conduct focus group  discussions and an example question set see Appendix 2). Before participating in the focus  group, each individual will have a short questionnaire administered to them to establish  occupation, income and expenditure, travel requirements for income earning and social trips,  and ownership and access to means of transport (for an example of Questionnaire B see  Appendix 3).     Based on this methodology and depending on sample size, data collection in each settlement  will take approximately 5 working days. Tasks within these 5 days should be distributed thus:    Day 1 - devoted to establishing contact with the key informants to mobilise survey  sample and doing a physical reconnaissance of the settlement.     Day 2 - would involve in-depth interviews with the community service providers.     Days 3-5  - would involve administering the individual questionnaires and  interviewing the focus group discussion participants. Other participatory mapping  techniques may also be used to measure the development of social networks.    After administering the household survey questionnaire to the randomly selected groups of  the sample of adult men, adult women and students, each group should be requested to give  its views about the village including drawing of the map of the village (for a description of  how to use maps, mobility charts and ranking exercises to collect data, see Appendix 4).     In preparation for these enquiries the team leader must brief the groups about the objective of  the survey and the general participatory approach to be followed during the study to map the  area’s resources and social attributes.    Aspects that need to be considered during the mapping activity include:   Selection of appropriate place for drawing the map and discussion - principally under tree  shade   Drawing the map of the village should involve discussion among the group members  under the guidance of the enquiry team    The map may be prepared on paper, on a board or on the ground    After the groups have agreed on the map produced by the participation of all members, the  enquiry team should transfer the information to a permanent format (e.g. sketched on paper,  or photographed). This can then be used in all focus group questionnaires administered to  each group. After finalising the participatory mapping process, the group should be allowed to  respond to the other questions presented in the Focus Group questionnaire.     A summary of the methodological approach adopted for the case studies in Vietnam, Zambia  and Ethiopia is described in Box 5.    18 Box 5: Methodological approach to conducting social benefits surveys adopted in Vietnam,  Zambia and Ethiopia  Step 1: Sampling and site selection    Undertake purposive sampling to capture the impact of rural road improvements and compare the  impact of transport improvements at:  National level:  three countries chosen from a wide array of geographical areas – Vietnam, Zambia    and Ethiopia  Settlement level:  a) remote rural settlement and b) well-connected rural settlement   For each, a settlement where road maintenance, rehabilitation or construction has taken place in  the last 5 to 10 years, and a control settlement where NO road maintenance, rehabilitation or  construction has taken place in the last 5 to 10 years, selected with assistance from the local  transport authority who has information on recent transport interventions and local socio- economic characteristics.    The control settlement is used to factor out any non-transport benefits/disbenefits on the  community.  Step 2: Survey team composition   Identification of Team Leader, specialist team members and enumerators, with disciplines in  sociology, economics and engineering.   Undertake survey reconnaissance drawing on secondary literature and Census data and in  discussions with personnel working on associated research projects from multi/bi-lateral donors  and government departments.  Step 3: Survey methodology   Key informant interviews held with each of the community service provider categories (teacher,  health worker, religious leader, local government official). These four people asked to help in  organising three separate focus group discussions of adult women, adult men, and secondary  school students, respectively, numbering 20 people each (total of 60 people in each settlement).    Before participating in the focus group, each individual to have a short questionnaire administered  to them.    Data collection in each settlement takes approximately 5 working days. The first day devoted to  establishing contact with the key informants and doing a physical reconnaissance of the  settlement. The second, third and fourth days spent interviewing the focus group discussion  participants, administering the focus group discussions and the individual questionnaires. The fifth  day undertaking in-depth interviews with the community service providers. Other participatory  mapping techniques may be used to measure the development of social networks.  For each settlement:   Day 1 – Arrive in settlement, meet key informants and administer Questionnaire A  Day 2 – Focus group with 20 adult women preceded by 20 questionnaires (Questionnaire B)  Day 3 – Focus group with 20 adult men preceded by 20 questionnaires (Questionnaire B)    Day 4 – Focus group with 20 students  preceded by 20 questionnaires (Questionnaire B)  Day 5 – Slack period: local data collection, interviewing community service providers etc   The timeframe for undertaking field testing is approximately 15 days per country (the control and  non-control for each location can be surveyed simultaneously if two separate teams are available).  Step 4: Analysis and reporting procedure   The summary report by the survey team to contain an analysis of the data from the surveys  undertaken in each settlement. The report should contain the team leader’s views on the significant  issues which emerged from the study and any recommendations that would follow from this.  Analytical report format:   Background to the country area under survey   Institutional framework and planning of roads in the country area under survey   Characteristics of survey provinces, districts and villages   Findings from the focus group discussions and questionnaire analysis  19 4.7 A NALYSIS OF THE  DATA   Analysis and interpretation of data collected in the field is key to providing an overall  impression of the pre-impact (and post-impact) condition of the infrastructure intervention at  the survey sites. Assuming the data has been collected correctly and provides an accurate  representation of trip-making activities prior to road investment, it can be analysed to  determine key relationships between the status of the road infrastructure and the prevailing  socio-economic situation in the surrounding communities.     Data from the survey can be stored in a database or spreadsheet format, from which both  quantitative and qualitative data can be analysed. The household survey data can be recorded  in a Microsoft Excel spreadsheet, and so too can qualitative data.     Both qualitative data from the focus group discussions, and the other participatory processes  as well as from the quantitative surveys should be reported. (Box 6 shows an example of  qualitative data reporting from the case study in Zambia. Here respondents from a well- connected rural and remote rural village were asked to rate the importance or severity of the  phenomenon that they are reporting, in this case the extent to which the transport intervention  was a catalyst for social impact (both benefits and disbenefits) on the community. The scale  used was from +10 for very positive advantages to –10 for very negative disadvantages.    Box 6: Reporting focus group data on social impact of transport interventions    Kawama (well connected)  Makangila (remote)  Group  Advantage  Disadvantage  Score*  Advantage  Disadvantage  Score  Adult men  Trips to places e.g.  trading places have  reduced, able to travel  out of the village and  back the same day   Too much dust on  the road causing  environmental  problems   4 Trading  has  become easy  Has opened  access to the  area for  thieves  2 Adult  women  Women are able to  use bicycles to get to  various places.   Women cyclists  are vulnerable  when they meet  male  cyclists  8 Find it  safe  now to  travel on the road   non  availability of  public  transport in  the area  2 Male youth  The road has provided  access to other  villages where they go  to look for  employment  They  tend to over  speed causing  accidents   5 Are now confident  to travel to town  either walking or  riding  A lot of  accidents  with bicycles  -3  Female  youth  Road has improved  access to the market  where they go to buy  vegetables and other  food  Forced to walk to  such places due to  traffic congestion   (bicycle) on the  road   6 The road has made  them more secure  to travel to social   places on their own  The road has  made them to  be more  outgoing  -2  Male  children  They are able to go to  school on their own  because the road is  now open and safe.   They play on  the  road and hence are  involved in   accidents   5 No impact  No impact  0 Female  children  They go to school on  their own  Play in the road  and cause   accidents  4 No impact   No impact   0 *+10 very positive advantages to -10 very negative disadvantages    The scores obtained from tables generated by the survey questionnaires and focus group  discussions, as shown in Box 6, can be averaged across the survey sample to indicate overall  ‘preference’ by the community, disaggregated by gender, age and income. It is important that  interpretation of the scores include feedback from the community, to explain their reasons for  the score given.  20 5 I NCORPORATING  SOCIAL  B ENEFITS INTO  T ECHNICAL  A PPRAISAL OF  R OADS   5.1 I NTRODUCTION   Transport appraisal provides an important link between technical work and political decision- making. A sound and comprehensive system should combine engineering, economic,  environmental and social appraisal within a single analytical framework. It should be capable  of explanation and communication to a wide range of decision-makers and other stakeholders  and map on to their information needs. The main shortcomings of the existing methods of  appraisal have been identified and discussed in Section 2 of this ORN. This ORN attempts to  set out an adapted process for transport appraisal that better incorporates wider social  considerations. To aid this process a research project connected with the production of this  ORN also produced analytical software for social benefit analysis. This section of the ORN  gives a description of the social benefits software tool developed and how this tool can be  used to supplement the  Highway Development and Management Model  (HDM-4), and other  similar systems, in road transport appraisal (Kerali, 2000).  5.2  S OCIAL BENEFITS SOFTWARE TOOL  -METHODOLOGY   As has been explained earlier, many social benefits are difficult to quantify, let alone to value  in money terms, using current tools and techniques. The challenge is to develop a  comprehensive appraisal system that is flexible and capable of combining both quantitative  and qualitative benefits, and monetised and non-monetised benefits into a single analytical  framework.     Associated with this Overseas Road Note, a suitable framework has been developed, based on  multi-criteria analysis (MCA) principles and incorporated into a computerised software tool.  This tool provides a means of assessing the social consequences of different transport  investment projects, standards, strategies and policies. In particular, the results of analysis  carried out using this newly-developed tool can be used within globally accepted road  appraisal models, such as HDM-4. Firstly though, the following paragraphs outline the  principles of multi-criteria analysis used in the development of the social benefits software  tool and the principles of operating the tool itself.    Multi-criteria Analysis    Multi-criteria analysis provides a systematic framework for breaking a problem into its  constituent parts in order to understand the problem and consequently arrive at a decision. It  provides a means to investigate a number of choices or alternatives, in light of conflicting  priorities. By structuring a problem within the multiple criteria analysis framework, road  investment alternatives may be evaluated according to pre-established preferences in order to  achieve defined objectives.    MCA basically requires the clear definition of possible  investment alternatives,together with  the identification of the  criteria under which the relative performance  of the investment  alternatives in achieving pre-established  objectives is to be measured. Thereafter it requires  the assignment of  preferences (i.e. a measure of relative importance, or weighting) to each of  the criteria.    21 This section will describe in more detail the different basic elements of Multi-Criteria  A nalysis.    Investment alternatives Several investment alternatives can be analysed to determine, for example, which is the most  cost-effective to implement. An alternative is one of a set of mutually exclusive works  alternatives specified as options to be analysed for a road section. It could consist of different  works options applied to various sections making up the study. For example, the resurfacing  of a road section constitutes an option or alternative. Similarly the existing maintenance  practices would constitute another option for the same section. Standards refer to the targets  or levels of conditions and performance that a road administration aims to achieve. Road  agencies set up different standards that can be applied in practical situations in order to meet  specific objectives that are related to functional characteristics of the road network system.    Any number of investment alternatives may be specified. However, it should be noted that  when the number of criteria and alternatives is large, this results in a large number of pair- wise comparisons, which reduces its practicality.    Objectives and criteria Perhaps the most important component of the MCA process is the identification of the  objectives relevant to the problem of defining investment alternatives, together with their  associated criteria. A general objective may be specified from several viewpoints; for  example social, economic, environmental and political. An example of the social impacts of  road investments has been given in Box 2, Section 3.    Objectives should be developed in a hierarchical fashion (Stewart, 1992). The hierarchy may  be obtained by either a deductive or an inductive approach.     Deductive approach, the starting point is a general but imprecise objective statement (e.g.  a main goal), which is refined into more precise sub- and sub-sub objectives.    Inductive approach, all the possible features of the alternatives are laid out and then  grouped and aggregated until they form a coherent and logically connected set of  evaluation objectives.     The deductive approach has been used for the development of the social benefits software tool.    Two important concepts, those of specification and  means-ends,are utilised repeatedly when  developing objectives.     Specification means that when an objective is subdivided into lower-level objectives the  intended meaning of the more general objective is clarified. Similarly, the lower-level  objectives can be thought of as the means to an end ,the end being the higher-level objective.  Careful attention to these concepts helps in reducing the presence of ‘holes’ in the hierarchy.    The identification of objectives normally takes place during the problem formulation stage. It  is by no means a trivial task. Keeney and Raiffa (1976) provide some guidelines for the  generation of objectives as follows:     The study of existing literature to review whether similar problems have been tackled  before, as some objectives may be drawn from previous works.   The modelling of the system under consideration, as some objectives may emerge  naturally from the model definition.   Surveys of interested parties or through the use of focus groups.  22 The development of criteria is a key task associated with the development of objectives. A  us eful general definition of a criterion  is as a (Voogd, 1983):     “Measurable aspect of judgement by which a dimension of the various  choice possibilities under consideration can be characterised”    Voogd identifies three types of criteria:     1. Attainability ,which give an insight into the chances of a specific alternative being  realised;   2.  Veto , which allow the exclusion of those alternatives which are not relevant; and   3.  Desirability, which allow the degree to which an alternative is desired from a  particular point of view to be specified.     In decision-making problems, only achievable and relevant alternatives are considered. The  criteria used in this type of problem therefore correspond to the desirability criteria type.  These criteria constitute a means for determining the degree to which objectives are achieved.     Depending on the way the objectives are defined, one or more criteria may be associated with  each objective. In the case of a general objective a number of criteria may be needed to  ascertain whether the objective is met. In the case of more precise objectives, each of them  may have an associated criterion used to describe whether each individual objective is met.    Attributes and measurement scales (Performance) Attributes are surrogate measures of performance, and they may measure the achievement of  objectives directly or indirectly. Each criterion should be represented by an attribute ,or  surrogate measure of performance, of the consequences arising from the implementation of  any particular alternative, A j. For each objective,  O i, an attribute X imay be identified to  indicate the degree to which objective O iis achieved. A specific level of achievement  measured on the attribute,  X i, is indicated by x i. In a particular problem with n attributes, the vector of consequences may be expressed as  x  (x 1, …, x n). For a particular alternative, A j, the consequences may be expressed as  x j,where  the elements  x ijcould be either a probability distribution over the possible consequences of A j or a deterministic relationship between A jand its consequences 2. Attributes may measure the achievement of objectives directly or indirectly. When the  objective is measured indirectly the attribute is called a  proxy attribute.Proxy attributes  reflect the degree to which an associated objective is met, without directly measuring the  objective. Scales are needed to measure both direct and proxy attributes. There are two types  of scales:     Natural  are those which are established and enjoy common usage and  interpretation and    Constructed (subjective) are those developed specifically for a problem being  addressed.     The latter are normally employed when no natural scales are available (e.g. for measuring  social capital, where, for example, verbal descriptions of various degrees of social capital may  be linked to an integer value along a scale). An important aspect that should be taken into  account when dealing with scales is that of standardisation. The aim of standardisation is to    2It is assumed here that the attributes are defined in an increasing sense, that is, the decision maker  prefers larger to smaller values of each x i, all other things being equal.   23 bring the measurements of all attributes to a common scale (e.g., between zero and 100). This,  a lthough not a requirement, makes the understanding of the alternatives’ performance on each  criterion easier.    Preferences (Relative importance) The selection of a particular set of investment alternatives will greatly depend on the relative  importance (or weights) assigned to each criterion. The identification of those responsible for  defining the weights will depend on the extent of the applicability of the investment  alternatives being defined, whether they are local, regional, national, or whether the standards  defined are legally binding or are simply guidelines.    Ideally, all stakeholders together with those involved in the identification of objectives and  the measurement scales for quantifying attributes should be involved in the process of  deciding the relative importance. Consequently, the different views of environmentalists,  social scientists, representatives of the community, engineers and politicians may be  combined in a rational way to reach weightings that are acceptable to all.    Implementation of AHP Methodology    The social benefits software tool, produced in association with this guidance, has been  developed using the Analytical Hierarchy Process (AHP) method. The AHP method has been  selected for implementation in the social benefits software tool because it systematically  transforms the analysis of competing objectives to a series of simple comparisons between the  constituent elements. In particular, the approach does not require an explicit definition of  trade-offs between the possible values of each attribute (i.e. it is not necessary to build utility  functions), and it allows users to understand the way in which outcomes are reached and how  the weightings influence the outcomes. Hence, the approach is useful when the decision  maker needs to decide whether an alternative option is better than another option on the basis  of all the criteria and to easily determine the relative importance of these criteria. It is an  attractive methodology as the decision makers may focus, in turn, on each small part of the  problem. AHP is based on ‘pair-wise’ comparisons of alternatives for each of the criteria to  obtain the ratings, (Cafiso et al, 2002).    Input Requirements    The social benefits software tool requires three main inputs:      A clear definition of mutually exclusive investment alternatives (for each road section) to  be compared;    The main goal, objectives, criteria and attributes under which the alternatives are to be  compared;    A statement of preferences on the set of objectives.    A comprehensive definition of the main goal, objectives, attributes and the relative weights  will result in what can be called the “MCA tree”. Figure 2 shows an example of the MCA tree  constructed for the following:   The main goal (e.g. poverty alleviation)   Two hierarchies of objectives; the first level contains two objectives (e.g. focus on  agricultural access to export markets (M) and local access to services (N)), and the  second level comprises 5 sub-objectives (e.g. For the 2 nd objective you could have sub- objectives of paths and tracks to local clinics (Y), roads to major service centres (Z) etc).  The number of levels to be defined is at the discretion of the user, and it is not limited in  the software.  24  Three mutually exclusive investment alternatives to be compared (A, B, C) (e.g.  investments in changing transport conditions in three geographically separate areas).    MCA Tree Main Goal First Level O bjectives Second LevelObjectives Section Alternatives  A B C Figure 2: MCA Tree    Figure 3 illustrates the inter-relationships amongst the objectives, and between the lowest- level objectives (or indicators) and the investment alternatives. It is important to verify that  the sum of weights defined for all the branches originating from each object equals unity.    Figure 3: Normalized Weights at each Node    0.8   0.2   0.5   0.3   0.2   0.6   0.4   0.1   A B C 0.4   0.5   Normalized Weights at each Node M N U V W Y Z M N U V W Y Z 25 5.3 A NALYSIS AND  OUTPUTS   Putting the approach into practice, this section guides you through the methodology employed.  For each investment alternative, a score is calculated as the sum of the products of normalized  weights along each branch of the MCA tree ending at the investment alternative node. Figure  4illustrates how the score is calculated for investment alternative A:     Score = [(0.8x0.5x0.1)+(0.8x0.3x0.3)+(0.8x0.2x0.8)+(0.2x0.6x0.7)+(0.2x0.4x0.1)]    = 0.332    The scores can be considered as the utility index (UI) in terms of social benefits value that  each investment alternative could yield, and can therefore be used as an indicator for ranking  or prioritisation of projects. The ratio of the utility index to the cost of implementing the  investment alternative also provides a useful prioritisation index.    Calculation of Scores 0.8 0.2 0.5 0.3 0.2 0.6 0.4 0.1 0.3 0.8 0.7 0.1 A Score = 0.332    Figure 4: Calculation of Scores  5.4  T HE OPERATION OF THE  HDM-4  MODEL   The social benefits software produced in association with the ORN is designed to be  compatible with well established road appraisal tools such as HDM-4. This section briefly  sets out the key features of HDM-4 that the reader needs to be aware of to appreciate how the  social benefits software integrates with the HDM-4 road appraisal tool.     HDM-4 caters for three applications levels commonly used in decision-making within the  road sub-sector at the meso and micro-levels. The different applications are:     Strategy analysis : For estimating medium and long-term budget requirements for  the development and preservation of a road network under various budgetary and  economic scenarios.     Programme analysis :For preparing single or multi-year work programmes under  budget constraints, in which those sections of the network likely to require   M   N   U   V   W YZ 26 maintenance, improvement, or new construction, are identified in a tactical  pl anning exercise.     Project analysis :For estimating the economic or engineering viability of different  road investment projects and associated environmental effects. Typical projects  include the maintenance and rehabilitation of existing roads, widening or  geometric improvement schemes, pavement upgrading, and new construction.    For all three applications, the underlying operation of HDM-4 is based on the concept of life  cycle analysis under a user-specified scenario of circumstances. This involves the analysis of  pavement performance, road works effects and costs, together with estimates of road user  costs and environmental effects, and economic comparisons of different project alternatives.  5.5  P RIORITISATION IN  HDM-4    There are often situations when the budget available for road projects will not be sufficient to  undertake all projects shown to have a positive return, that is, projects with positive economic  net present values (NPV). In such situations, a formal method of selecting projects to be  included within the budget can be applied. Capital budgeting or rationing can be applied to a  group of projects that meet either of the following conditions:     Projects that are independent of each other (e.g. list of road projects from different  parts of the country),     Mutually exclusive projects (i.e. projects that are alternatives to each other) when  only one alternative can be selected.    The NPV capital budgeting rules can be applied in both situations where sufficient funds are  available, and also when there is a budget constraint. The rules are summarised below:     When sufficient funds are available to undertake all projects; select all independent  projects with NPV > 0, select mutually exclusive project alternatives with the highest  NPV.     When capital rationing is to be applied due to shortage of funds; select independent  projects with the highest NPV to Cost ratio, select mutually exclusive projects using  the incremental NPV to Cost ratio method.    The incremental analysis is used to test whether the ratio of the increase in NPV to the  increase in costs between alternative mutually exclusive projects is greater than a specified  marginal ratio. If the ratio is greater than a specified marginal value, then the project  alternative is included among those to be funded. The marginal value is usually determined  from the benefit cost ratio (BCR) of the road project at the budget boundary 3. In addition to the economic prioritisation methods described above, HDM-4 (version 2)  includes another method of prioritisation based on a multi-criteria analysis framework that  considers a wider range of transport related issues. These include economic efficiency, road  safety, functional efficiencies, environmental issues, energy efficiency, and political concerns.    3For further details of the prioritisation method used in HDM-4, see Odoki and Kerali (2000).   27 5.6 L INKING THE  SOCIAL  BENEFITS  SOFTWARE  TOOL TO  HDM-4    For compatibility with HDM-4, the basic unit of analysis in the social benefits software tool is  the road section. These can be physical road sections (for all strategy, programme and project  analyses) or representative road sections (for strategy analysis). For each road section, the  user can define the section by descriptive parameters such as name, length, traffic and cost.  Additional information can be given on administrative unit, road functional class, surface type,  and Annual Average Daily Traffic (AADT).    The road sections can be defined directly by the user when operating the social benefits  software in stand-alone mode, or imported from HDM-4 (or other road investment software  systems). The cost of implementing each investment alternative should be determined. An  indication of benefits and resulting NPV may be determined from a technical (engineering  and economic) analysis, using for example HDM-4.    The investment alternatives analysed in the social benefits software can be exported to HDM- 4. These can then be analysed together with the other investment alternatives defined in  HDM-4 within the multi-criteria analysis framework incorporated in HDM-4, version 2. The  scores (or utility indices) calculated in the social benefits software can be used in the HDM-4  version 2 MCA process to combine social concerns with others (e.g. economic, environmental,  energy efficiency, road safety, etc.). For project analysis at community level, the utility  indices will be used to rank and select project alternatives. At national, regional or district  level, the ratio of the utility index to the cost of implementing each investment alternative can  be used through optimisation procedures as follows:     Programme analysis to prepare work programmes under specified budget  constraints     Strategy analysis to allocate budget between road classes, administrative units, and  work types     Research, for example to assess the impact of including/excluding social concerns  on funding for low volume road.  5.7  H OW TO USE THE  SOCIAL  BENEFITS  SOFTWARE AS A  STAND  ALONE  TOOL   The social benefits software can be used as a stand alone tool to analyse road transport  investment choices where the key objectives include enhancement of social benefits. For each  investment alternative a score, also referred to as the Utility Index (UI), is calculated as  described in Section 5.3 of this ORN. This index gives an indication of the utility, in terms of  social benefits, that may accrue as the result of implementing the investment alternative. The  utility index is considered to be analogous to the NPV which is used in economic analysis.    As a stand alone tool, the utility index can be applied under certain rules to select and  prioritise investment projects in both situations where sufficient funds are available, and also  when there is a budget constraint. The rules to be applied are summarised below:     When sufficient funds are available to undertake all projects; select all independent  projects with UI greater than that of the “base case” project (which is usually a “Do  Minimum” case), select mutually exclusive project alternatives with the highest UI.     When investment capital rationing is to be applied due to shortage of funds; select  independent projects with the highest UI to Cost ratio, select mutually exclusive  projects using the incremental UI to Cost ratio method.  28 The UI to Cost ratio is also referred to as the Prioritisation Index (PI). The incremental UI to  C ost ratio analysis is similar to the incremental NPV to Cost ratio method, and is used to test  whether the ratio of the increase in UI to the increase in costs between alternative mutually  exclusive projects is greater than a specified marginal ratio.   29 6 T HE  PROCESS OF  PRIORITISATION : A P ARTICIPATORY  A PPROACH TO  T RANSPORT  A PPRAISAL   6.1 I NTRODUCTION   For consistency and transparency there is a need to develop a road project prioritisation  process that incorporates both the appropriate appraisal tools such as HDM-4 (with the added  value of including the social impact effects) and full participation of stakeholders in  establishing the criteria for selection. Any process will need to be tailored according to the  national context of each road authority and so will be unique to that country. However, there  are set out some principles and common steps that should be followed.    In many cases, countries will already have well-established, accountable processes to  determine allocations of resources across government departments. In these cases the  incorporation of social benefits will be merely a technical exercise, controlled by an  accountable and transparent decision-making process. However, in some cases, as well as  making processes for project selection and decision-making more accountable and transparent,  there may be a need to develop accountable and transparent processes at all stages of the  transport decision-making process. This section sets out the development of an accountable,  transparent multi-level decision-making process:     It sets out the development of a participatory approach at the central and regional  government level that allows the setting of objectives and goals on which to base  resource allocation decisions.      It also maps a participatory process of deciding on policy options at the regional or  district level. This will allow the development of robust criteria to select projects at  the micro or community level.     It details processes that can be followed at the community or micro level to ensure  involvement and input of social benefits     At the meso, or regional level, prioritisation procedures are used to allocate funds for road  rehabilitation and maintenance to different regions and districts, as well as to different types  of road. The procedures are very varied and may be based on bidding and negotiation between  national and local authorities and road organisations, or they may be based on a formula.     At the micro level, prioritisation processes are used to develop consensus about choices  between competing projects and alternatives. The procedures employed draw upon the wide- range of robust and established techniques that are used to facilitate community involvement  and decision-making. They also highlight the use of techniques to give voice to marginal  groups within communities and incorporate all needs into the decision-making.    6.2  P RINCIPLES   Any approach that is developed should adhere to a common set of principles. These principles  should be:      Transparent.  The approach must be transparent enough for all involved to be able to  understand how funds are allocated.   30  Consistent. It must also be possible for all involved to be able to reasonable predict how  funds will be allocated using the procedure in the future.   Participatory .The approach will use consultation with a variety of stakeholders at all  stages of the development of the allocation process and within its operation. Consultation  should particularly be balanced between men and women and involve stakeholders that  are not traditionally involved in allocation decision-making. It should also be guided by  the principal that every opinion is valuable and should be included in the process.   Flexible.  The approach developed should have flexibility enough for it to be adaptable to  a variety of situations. Approaches should be flexible enough to be used for a range of  transport and geographical situations and for a range of different levels and audiences,  from low-income communities, to national NGO’s and policy-makers.   Of assistance and not prescriptive .Technical approaches using engineering, economic  and social analysis should be employed to assist transparent and participatory decision- making processes. Technical approaches should not be there to decide actions or justify  non-transparent decisions.   Iterative.  A repeated exchange should take place between technical analysis and public  consultation and decision-making processes in order to allow consensus to be developed  between the public perception of priorities and the technical assessment.   Multi-level process. Any approach developed will need to apply not only to decisions at a  local village level, but at district, regional and national levels as well. Decisions at  different levels should be connected and integrated and the decision-making processes  should follow consistent approaches.   6.3  P ARTICIPATORY GOAL SETTING AT THE  M ACRO  LEVEL   This approach seeks to involve a range of stakeholders in drawing up goals, objectives and  priorities for road development. It also seeks to set out in explicit fashion the assumptions and  positions of the different stakeholders. It must be recognised that this approach is inherently  political and must incorporate an understanding of the different interest groups and  stakeholders involved in the process.     The negatives of this approach are set out as  (World Bank, 2000):     Costs of consulting wide groups of stakeholders, particularly hard-to-reach  groups   Attitudes of technocrats   Capacity of the poor to participate effectively   Time requirements   Budget cycles and programme preparation deadlines   Negative prior experiences, lack of mutual trust    By contrast there are a series of potentially positive aspects and outcomes and these include:     Views of civil society and hard-to-reach groups (such as low-income  communities) are considered in policy formulation   Increased equity    Better understanding of implications for a variety of stakeholders including  low-income communities   Improved strategy in policy design   ‘Demystification’ of policy content – increased accountability and  transparency    31 The approach set out in this guidance will involve the following steps:     Organise budgetary debates with stakeholders. These incorporate an  intensive consultative process involving lengthy deliberation, negotiation  and bargaining over a set of macro socio-economic priorities between a  diverse group of citizen representatives and the government    Review investment plans of the previous year and discuss proposals for the  new year   Rank demands and aggregate stakeholder claims   Divide resources based on weighting system that combines subjective  preferences of stakeholders with the objective quantitative criteria     This stage will involve a significant degree of capacity building for a range of stakeholders.  This capacity-building will involve key tasks such as:     Building skills to understand and analyse the budget    Democratising the information and the capability to understand the budget    Organising social coalitions to support the cause    Actively engaging in the budget formulation  6.4  M ESO  LEVEL  PARTICIPATORY  OPTION  DEVELOPMENT   This involves a similar participatory process to the macro-level participatory goal setting  stage set out in Section 6.3. It features promoting the involvement of civil society in the  setting of objectives, development of funding criteria and allocation of resources by a meso- level institution such as a roads authority, transport or public works ministry.     Guidance on participation of and consultation with civil society can be found at  http://www.worldbank.org/participation/ It will set out the following steps to consider in the  planning and development of consultation:     Timeframe for planning and undertaking consultation exercise. Lack of time to consult  will often lead to a small set of well-organised actors being able to respond. These will  often be governmental bodies or those with external resources. More marginal or  vulnerable groups will often miss out on such consultation, though their contribution is as  valuable.      Selection of which organisations will be involved and invited? Thought needs to be given  to who is to be involved. Benefits will occur if groups other than the obvious or regular  stakeholders are involved.    How should groups be made aware of specialised information and issues within a sector?  Professionals and regular stakeholders may well be familiar with technical terms and  technical issues, although the ability of marginal, (but important) stakeholders in  technical discussions needs to be supported.    How should any information be presented? Again stakeholders not used to engaging in  technical transport discussions may need information set out in a particular way to aid  their understanding and appreciation.    Where and in what type of place should involvement take place? Women stakeholders  may not attend involvement events after dark for fear of their personal security. These  type of issues need to be considered in designing the method of stakeholder involvement.     How much resources should be allocated for participation? In a similar way to time  availability, consideration needs to be given to how much resource is allocated to  32 promote participation. Limited resources will limit the number and range of people who  c an be involved, thus damaging the accountability of any decision-making process.     What will happen after the consultation process? There needs to be a direct and  observable link between people being involved and the decisions made. People who  spend time contributing to a participation process will not involve themselves again if  decisions appear to be made that do not reflect what they perceive to have been decided.  6.5  A M ICRO -LEVEL PARTICIPATORY  ROAD  FUNDING  PRIORITISATION  APPROACH    There are common steps that many processes will have. A way of representing these is shown  in Figure 5, and Boxes 7 and 8 give examples of applications.    Figure 5: Flow-chart of process to include social benefits in rural transport appraisal    STEP 1: A method of a-priori fund allocation from the centre for some of the resources.  There needs to be established an agreed procedure to allocate fairly resources from the centre  to the next level of the region. This could entail an equal distribution across all districts of  50% of the road fund or a distribution according to accessibility measurement for the whole  region. Whichever approach is adopted there must be consultation. This must take the form of  consultation with wide range of representatives of road users, communities in the affected  areas, politicians and other civil society representatives.  STEP 2: A method of drawing up an initial list of roads or routes to assess.  This will  involve both public consultation and technical analysis. Within a region, public consultation  must take place with a wide range of stakeholders. Different communities can first nominate  an initial list of roads for further discussion and assessment, so that every route considered  will be a “wanted” road. At this initial stage some engineering advice will usually be required  to ensure that the routes chosen are broadly feasible from an engineering perspective. In  addition a parallel technical exercise can be conducted that could look at levels of  accessibility or poverty within different parts of the region to see where resources could be  targeted. The ILO developed an approach that uses accessibility measurement as an analytical  tool (see Box 8). In addition, engineering data on the quality of roads within different areas  could usefully be used.  Public consultation  Technical  Second public consultation  Decision-making History Initial list of options based upon screening process Initial decision on resource  33 STEP 3: Public consultation P ublic consultation needs to be undertaken with district  authorities and local communities to determine their problems, needs and priorities. The aim  of the public consultation is to identify the problems that people perceive to occur from poor  access. They will be able to add their own knowledge and experience to the technical  information that has been already collected. At this stage the initial selection of nominated  roads for assessment can be narrowed down to a final list of candidate roads for a more  detailed technical investigation.  The public consultation stage is also designed to draw up a set of priorities for action. The  public consultation should, in particular, involve groups that are not traditionally involved in  decision-making, especially women, young people, and low-income communities who need  to be involved as they are often most affected by the decisions made. There are a variety of  tried and tested techniques that can be employed to engage the public.     STEP 4: Technical assessment exercise  Technical assessments can be undertaken once a list  of priorities (i.e. candidate roads) has been established through the public consultation phase.  These include cost benefit analyses, engineering and social assessments. The Social  Assessments explore in more depth the problems and issues raised by the public consultation  exercise. More detailed accessibility analysis can be conducted to look at changes at a very  local level specific to different communities and road links. Once this data has been collected  and analysed, a technical priorities list can be established. This needs then to be taken back to  public consultation.     At this stage ‘social benefits’ may be incorporated into cost benefit framework through  including an additional benefit derived from deliberately weighting the population to benefit  from the road improvement by the unit change in transport costs involved. This is irrespective  of the existing volume of travel. In the Ghana Feeder Road Prioritisation procedure social  benefits were included in this way based on the transport cost savings (brought about by the  road investment) associated with five return passenger trips per person year along the road.  Additional benefits were also given in a similar way to those communities that were remote  from health centres and remote from markets. (The social assessments in Ghana had  previously established that communities were most concerned about access to medical  facilities and markets in their assessments of the need for improved transport infrastructure).       STEP 5: A further stage of Public consultation  This second round of public consultation  exercises should be designed to explain to a lay audience (from a wide range of stakeholders)  what has been found in the technical assessments. Consultation should be seen as an iterative  process to seek consensus on priority actions: seeking public views and analysing technical  options, and then returning to the public to report on technical analysis before agreeing a way  forward. While the guidance highlights two rounds of consultation, as many rounds as is  necessary should be undertaken in order to secure consensus between the public involvement  and the technical assessment.    STEP 6: Decision to implement improvements  The next stage then involves a decision to act  upon the agreed priority actions. The implementation of actions agreed between many  stakeholders will maintain the confidence of those involved in reaching the priorities for  action. There is also a need to allow everyone to be informed about progress towards  implementing the agreed set of actions. Publicity may need to be used in this process,  especially targeting those who could not be involved in the public consultation stages. Failure  to implement the agreed actions, will significantly damage the confidence of stakeholders in  the merit of being involved in the process. They may not easily be involved in the process  next time around.     STEP 7: History A record of the outcome of the public consultation, and the list of priority  actions should be kept for future reference. While it may not be possible to implement all of  34 the priority actions at the same time, they will still be seen as priorities as far as the  st akeholders are concerned. When more resources become available, the previously agreed  priorities can be used as the basis for deciding on further action. Retaining the list of priority  actions from such a process could avoid spending the time and effort repeating the  consultation process; however, it is always advisable to engage in more public consultation  before further action is taken to ensure that priorities have not changed as a result of earlier  actions.    Box 7: An Example of a Road Fund Allocation Process developed in Ghana  As part of a DFID-funded project a transparent and consultative process was developed to allocate road  funds for rural roads in Ghana. The process was developed for use by the Department for Feeder Roads  and the District authorities. The process consisted of a series of 5 steps set out below:  1. First round of improvements. Approximately 50% of the funds are allocated equally between the nine  Districts in the project area.   2.  Consultation. Consultation is used to derive a list of candidate roads from within the District. These  roads are then ranked by local communities prior to a technical analysis in Step 3.  3.  Technical analysis of candidate roads. Candidate roads are then assessed on economic and social  grounds and to produce a technical ranking based on this assessment.  4.  Return to consultation. The objective of this step is to compare the technical ranking (Step 3) with  the earlier District ranking (Step 2), and to achieve consensus on the final selection of roads for  improvement.  5.  Second round of improvements. Remaining funds not allocated in Step 1 (approximately 50%) are  used for more road improvements in accordance with the ranking process. The list of candidate roads  will be retained for several years for further rounds of improvement as they occur (Hine, 2003).  Box 8: ILO approach to prioritisation and selection of villages – the Integrated Rural Access  Programme (IRAP) in India  This approach was developed to identify access priorities of villages and sectors within a district. It  involved a participatory prioritisation workshop with the participation of District functionaries and  village representatives, in addition to District and Block level concerned officials. It also involved the  analysis of data, existing norms for provision of basic services and facilities by the government,  indicators and accessibility base maps; after comparison of different levels of accessibility between  villages across sectors, village priorities were established based on existing levels of access. The  process comprised a series of activities undertaken step by step as follows:   1. Methods and formula for calculating Village Access Problem Indicators  Based on the present national norms and targets of the Central/State Government for different sectors in  rural and tribal areas.   2. Training on calculation of indicators and prioritisation   Part 1: Presentation and analysis of accessibility database   The output of an accessibility database and base maps as well as road map and road inventory were  presented before a wide gathering of village and district level functionaries, officials and elected  representatives, to give them a picture of the real access situation.   Part 2: Training workshop on indicators and prioritisation   A three-day training workshop was organized for calculating village access problem using the  indicators and formula, and identifying village priorities.   3. Calculating the Village Access Problem Indicators  The use of qualitative and quantitative indicators is a common planning tool. Accessibility indicators  show the difficulty or ease with which households have access to goods and services. Indicators are  objective measurements of different levels of accessibility for different trip purposes in a village.  35 Indicators are used to identify villages that are most affected in relation to basic needs and level of  social and economic services.   4.Village priority setting  IRAP calls for identification of action priorities for reaching services and facilities. After calculating  sector-wide village access indicators and coming out with total problem score points for each sector by  village, this step is to calculate priorities.   5. Preparation of problem maps  Sector problem map: One map for each sector of the region is prepared showing village boundaries and  coloured as per priority ranking. Combined problem map: This map shows problem score, problem rank  of each village for all sectors in different colours.  Source: Pattanaik (2003)  36 7 R EFERENCES   ActionAid (1992). From input to impact: participatory rural appraisal for ActionAid the  Gambia. London: International Institute for Environment and Development   Cafiso, S, A Di Graziano, HR Kerali, and JB Odoki, (2002). Multicriteria Evaluation for  Pavement Management Maintenance Using HDM-4. Transportation Research Record, Journal  of the Transportation Research Board No 1816, Paper No. 02-3898, pp 73-84, National  Research Council, Washington, D.C.     DFID (2003).  Making connections: infrastructure and the poor. London: Department for  international Development    Gannon, A. and Liu, Z. (1997). Poverty and transport . TWU-30 Paper. Washington  D.C.: World Bank    Hine, J. (2003).  Are social benefits the missing component of road appraisal ?. Social Benefits  Think Piece Paper. Unpublished report. Crowthorne: TRL Limited     Keeney, RL and H Raiffa, (1976). Decisions with Multiple Objectives: Preferences and Value  Tradeoffs. First edition, Wiley, New York.    Kerali, HR, (2000). Overview of HDM-4 - Volume 1 of The Highway Development and  Management Series .International Study of Highway Development and Management  (ISOHDM), World Road Association PIARC, Paris. ISBN: 2-84060-059-5.     National Environmental Secretariat (1990). Participatory rural appraisal handbook,  conducting PRA in Kenya. Nairobi: Natural Resources Management Support Series  No. 1    Odoki, JB and HR Kerali, (2000).  Analytical Framework and Model Descriptions – Volume 4  of The Highway Development and Management Series .International Study of Highway  Development and Management (ISOHDM), World Road Association PIARC, Paris. ISBN: 2- 84060-062-5.     Pattanaik, P.K. (2003).  Integrated Rural Accessibility Planning in Orissa – Access  Problem Indicators and Priority Setting. Paper presented to the 3 rd International  Focus Group on Rural Road Engineering, Colombo, 19-23 June 2003.   Stewart, TJ, (1992).  ACritical Survey on the Status of Multiple Criteria Decision Making:  Theory and practice. OMEGA International Journal of Management Science, Vol. 20, No 5/6.    USAID (1982):  Rural roads evaluation summary report .A.I.D. Program Evaluation Report  No, 5, March. Washington D.C: The United States Agency for International Development    Voogd, H, (1983).  Multicriteria Evaluation for Urban and Regional Planning. Pion Limited,  London.    World Bank (2000). World Development Report 2000/2001: Attacking Poverty .Washington  D.C: World Bank    37 Appendix 1 – Questionnaire A: Key informants  38 Questionnaire A: for Key Informants within the Settlement  To be administered to a gathering of 1 senior administrative leader, 1 teacher, 1  health worker, and 1 religious leader    Survey No. ___________    Date ____________    Interview duration _____________    Enumerator___________________ Interview location __________________    1. Settlement  What are the settlement’s boundaries?                     Area of km 2________    What is the total population? ________  How many households?  ________    How many:    men________   women ________  male youthº  ________    female youthº  _________  male children* ________female children*________     ºaged 12-18 years    *under 12 years old    2. Village Topography    a) Describe the terrain along which the road passes: (tick one of the following)    Flat………. Rolling………… Hilly………. Mountainous………..    b) Describe the vegetation cover around the village: (tick one of the following)    Marsh…………  Open………..        Forested…………..    Grassland…………… Semi-arid………….    3. Local Accessibility    a) Distance to:  •main road?     ________km  • main local town?  ________km  • regional capital?  ________km  • national capital?  ________km    b)  What is the distance to the nearest educational facilities and how many services are  available in and around the settlement? (If educational facility in village, write 0  against km)    Type  Kindergarten Primary  Secondary  Technical  Other  Km       No.       c)  What is the distance to the nearest health facilities and how many services are  available in and around the settlement? (If health facility in village, write 0 against km)    Type  Health post  Clinic  Hospital  Other  Km      No.      39 d) What is the distance to other facilities and how many services are available in and  around the settlement? (If facility in village, write 0 against km)    Type  Market place  Place of worship  Police post  Local govt office  Other  Km           No.           4. Local Economy  a) Major occupations in settlement (list 4 main ones in order of importance with  estimate of % of total population involved)    Occupation 1  %Occupation 2  % Occupation 3  % Occupation 4  % Adult men                 Adult women                 Male youth                 Female youth                 b) What are the defining characteristics of the following income groups in the      community? Indicate the income range that applies to each group:  •High-income people    • Medium-income people    • Low-income people    c) Major sources of local tax revenue (list 4 main ones in order of importance)    1………………………………………….    2………………………………………….    3………………………………………….    4………………………………………….    5. Description of Transport Intervention   a) Describe what type of road construction or maintenance activity has been  undertaken in the last 10 years?      ____________________________________________________________________    ____________________________________________________________________    ____________________________________________________________________    40 b) Describe the characteristics of the transport intervention. Established:       • By whom? __________________________________________________________   • When? _____________________________________________________________    • Where? _____________________________________________________________    • How? ______________________________________________________________    • Why?_______________________________________________________________    • Funded by?__________________________________________________________    Nature of funding: Original outlay ____________ Maintenance costs:_____________    c) Describe the volume of traffic per day, and composition of vehicles using the road  (motorised and non-motorised transport) for the following scenarios:    BEFORE intervention  AFTER intervention  CURRENT situation  Indicative  VOLUME OF  TRAFFIC per day  (Annual Average  Daily Traffic) on  the road    COMPOSITION  OF VEHICLES  using the road  (proportion of  heavy vehicles,  motorised and  non-motorised  transport, by  mode)    41 d) Describe the condition of the road and structures (bridges, culverts etc) for the  following scenarios (before and after the intervention, and the current situation)    Rating:  -2   very bad  -1   bad  0 fair  1 good  2 very good    RatingComments  BEFORE intervention    AFTER intervention    CURRENT situation    42 6. Impact of Transport Intervention  What have been the advantages/disadvantages of the transport intervention for the  settlement:    Advantages Disadvantages  In the first year?    In the second year?    In subsequent years   until last year?    Since last year?    43 7. Differential Social Impact   How have different categories of people been affected by the transport intervention?    Advantages Disadvantages Score  Adult men    Indicate the overall score:    Positive (+10)    Negative(-10)   Neutral   (0)    Adult women    Indicate the overall score:    Positive (+10)    Negative(-10)    Neutral   (0)    Male youth (12-18 yrs)    Indicate the overall score:    Positive (+10)    Negative(-10)    Neutral   (0)    Female youth (12-18 yrs)    Indicate the overall score:    Positive (+10)    Negative(-10)    Neutral   (0)    Male children <12 years    Indicate the overall score:    Positive (+10)    Negative(-10)    Neutral   (0)    Female children < 12 years    Indicate the overall score:    Positive (+10)    Negative(-10)    Neutral   (0)    -10  -9 -8 -7 -6 -5 -4 -3 -2 -10 1 2 3 4 5 6 7 8 9 10 -ve         Neutral                      +ve  44 8. Differential Economic Impact  How have different economic strata of people been affected by the transport  intervention?    Advantages Disadvantages Score  Wealthiest     Indicate the overall score:    Positive (+10)    Negative(-10)    Neutral   (0)    Middle-income     Indicate the overall score:    Positive (+10)    Negative(-10)    Neutral   (0)    Low-income poor    Indicate the overall score:    Positive (+10)    Negative(-10)    Neutral   (0)    9. Estimate of range and depth of impact:    a) Radius of influence: length/area                            ____________km/km 2 b) Population impact:                ____________    -10  -9 -8 -7 -6 -5 -4 -3 -2 -10 1 2 3 4 5 6 7 8 9 10 -ve         Neutral                      +ve  45 Appendix 2 – Guidance notes for focus group discussions  46 SOCIAL BENEFITS PROJECT: VIETNAM    G UIDANCE NOTES FOR FOCUS GROUP DISCUSSIONS: ADULT MEN, WOMEN, & STUDENTS    Any questions about this questionnaire should be forwarded to Annabel Davis email: adavis@trl.co.uk Sampling Selection  The four key informants (senior administrative leader, teacher, health worker and religious leader) will be asked to  help in organising three separate focus group discussions of adult women, adult men and secondary school students  in each settlement. The focus group discussions (FGD) for each group should be carried out on separate days, and  each FGD will be undertaken after Questionnaire B has been administered to participants:   Day 1: Questionnaire A administered to key informants   Day 2: Questionnaire B administered to 20 adult women, and FGD undertaken with the same group of women   Day 3: Questionnaire B administered to 20 adult men, and FGD undertaken with the same group of men   Day 4: Questionnaire B administered to 20 secondary school students, and FGD undertaken with the same group  of students   Day 5: Interviewing community service providers    The focus group discussions should be participatory and not prescriptive. The FGD’s comprise a series of semi- structured questions and recommended exercises to be used for enquiring about the community’s perception of social  costs and benefits attributed to transport interventions. The questions should be used to facilitate discussion and the  focus group dialogue is not limited to the 10 questions in these guidelines. Please try and ensure that everybody  present is given an opportunity to speak, and that one of the facilitators notes down a thorough description of  proceedings, including interesting verbatim remarks by participants.   Facilitator’s Introduction to focus group participants  Begin the focus group discussion by building up a rapport with friendly conversation to ‘break the ice’ (although the  participants will already be known to the facilitators). Reiterate who you are, who you are working for, what  information you require and why you require the information.   Stress that this research is being conducted to identify possible ways of resolving rural transport problems.   It is important that the participants feel completely at ease during the FGD so they can discuss freely.  Ensure that there are refreshments available during the session, and make sure that all the participants are  given the opportunity to speak.   There should be at least two facilitators present – one to lead the discussion and ask questions, and one to  make thorough notes from the FGD – ensure that both facilitators are proficient in participatory techniques,  and in any local dialects.   The participatory visual exercises used in the FGD’s (ie. Maps, ranking exercises etc) should be  undertaken on flip chart paper using different coloured marker pens.   The note taker should capture everything that is mentioned in the FGD and record the discussion clearly in  English and with legible writing. Any visual exercises (ie. Maps and ranking exercises) should also be  recorded on A4 paper, and the original flip chart papers kept as a record.   The note taker should try and quote interesting verbatim remarks from participants, especially if they’re  highlighting a particular issue.   The discussion should not last longer than 3 hours   The guideline questions provided with these notes should be used to facilitate discussion, but the focus  group dialogue is not limited to the 10 questions provided. Should other questions emerge from  discussions, be sure to note any responses down on paper as a record.   The questions provided will generate a lot of discussion. Hence, the FGD question sheets provide blank  pages on which ALL notes should be recorded for each question. Ensure that all pages for each FGD are  stapled together. If necessary, write on both sides of the paper, and if more paper is required, indicate  clearly which question the notes refer to, and attach it to the question sheet.   At the end of each FGD, thank the respondents for setting aside their time to answer your questions.    Any problems, unusual circumstances while interviewing, additional background information and other  observations made that could be helpful for interpretation of the questionnaire should also be noted.    Ask the respondents if they have any census data for the settlement, or if they have a map of the settlement and  surrounding area. This will be useful for validating the data collected, and in facilitating the focus group discussions.  47 ADMINISTERING FOCUS GROUP DISCUSSIONS    R EMEMBER! WRITE NOTES IN LEGIBLE ENGLISH, RECORD INTERESTING QUOTES,  REPRODUCE PARTICIPATORY VISUALS ON A4 PAPER, GIVE EVERYBODY THE  OPPORTUNITY TO SPEAK    Survey No.  –Number each FGD question sheet for each group of adult women, adult men, and students, for each  settlement sequentially ie. 1, 2, 3 etc.    Date  – Date of interview as: day/month/year    FGD duration  –Indicate how long the interview took to administer in minutes    Enumerator  – Write your first initial and last name    Interview location – Full name of settlement area as precise as possible    QUESTION 1    Start the focus group discussion by asking participants to draw a map of the community, indicating the key  features and landmarks, along with the roads, tracks, rivers, schools, health centres, places of worship, and other  facilities of note such as water and firewood sources, and location of farms.    Use the map to discuss mobility in the community, indicating what modes of transport are used to travel to  different locations and for different purposes, the frequency and duration of such trips, and the distance and cost.    Ask whether there has been any road construction or maintenance activity in the past 10 years and note down  what type of intervention has taken place.   Where there has been a transport intervention in the last 10 years, ask participants to indicate what difference the  intervention has had on facilities available in the community, and to draw differences in mobility patterns in the  settlement, both before and after the transport intervention.   Ask participants to discuss what benefits and constraints the intervention has had on the community.    QUESTION 2   On the same map, ask participants to record where people travel to maintain social networks both before and  after the transport intervention. Ask questions about whether social networks are important to adult women,  adult men and students, and the social trip-making characteristics:    Discuss why people make social trips – for what purpose, how frequently?   Who do the women visit? – friends, relatives, community associations, leisure activities, weddings,  funerals   Where do they travel? – inside/outside the settlement, urban/rural, distance travelled, mode taken,  cost   Does the road make it easier to maintain social networks?   What are the costs and benefits of maintaining social networks?   Ask whether the transport intervention has had any impact (positive or negative) on maintaining social networks.   Make sure the map has been reproduced on paper (flip chart or A4).    QUESTION 3   Ask the participants to discuss the defining characteristics of different income groups (high, medium and low) ie.  Type of housing construction – walls and roof, ownership of assets ie. Bicycle, vehicle, area of land etc.    QUESTION 4   After breaking the ice using the resource/social mapping exercise, and getting to know the community better,  ask the participants to discuss what a typical mobility pattern is during a week day for each group (adult women,  adult men and students).  48  Undertake a mobility mapping exercise to establish trip distance, destination, frequency and modal choice of  daily income and non-income earning activities presented in a schematic diagram. The chart should be drawn in  aspider diagram format, with participants drawing arrows from their ‘household’ at the centre of the diagram in  varying thickness and colour to denote frequency of trips and different transport modes respectively. The arrow  points towards a drawing which represents a particular activity for which the journey has been made (eg. Farms,  river, market, women’s group meeting).   Ask the group to draw a mobility diagram for each income group (high/wealthy, medium and low/poor) to  discern travel patterns between different economic strata.   Using the mobility diagram, discuss how daily mobility varies for each income group in terms of trip purpose,  distance, cost, mode etc.    How has daily mobility changed over time – ie. Last 10 years, has it improved or deteriorated?    QUESTION 5   Ask the participants to describe the accessibility of the settlement before and after the road intervention and ask  them to give a rating (0 to 4) to describe access to particular locations (health care, schools, markets, places of  worship, leisure activities, other), and provide reasons.   Complete the table and use it to discuss how and why accessibility has improved or deteriorated over time.  Provide reasons for the rating in the appropriate column.    QUESTION 6   Ask the participants to discuss how transport mobility has changed in the settlement over the past 5 years for  each income group (high, medium and low).    QUESTION 7   Ask the participants to describe how the transport intervention has affected people’s mobility by income group.   In the table provided, give a rating from -2 to +2 for the effect of the transport intervention on mobility.    Complete the table and use it to discuss how and why the transport intervention has affected people’s mobility  by income. Write reasons in the ‘comments’ column.   Under the category ‘social benefits’ ask participants to describe how the transport intervention has affected their  livelihoods (general welfare, income generation, health, education, social networks etc).      QUESTION 8   This question asks participants to discuss particular problems that affect their mobility/accessibility for different  income groups. Facilitate discussion on mobility constraints in some detail, as this will provide information for  the ranking exercise in Question 9.    QUESTION 9   Continue the discussion about accessibility constraints from Question 8, and carry out a ‘brainstorm’ on the  negative and positive effects of transport and mobility on the community, relating to all aspects of income  generation, general health and welfare, and maintenance of social networks (friends, relatives, membership of  community associations etc).   After a period of discussion, undertake a ranking exercise to establish which ‘indicators’ of social benefits are  most important to the community.   Preference ranking :ask the group to vote for the most and least important effects of transport on the  community, based on the previous discussion, and get consensus on the ten most important effects of transport.   Pairwise ranking :this exercise enables the comparison of priorities of different individuals in the group. Use  the set of preferences identified in the preference ranking to fill in the table given in Figure A1 (enlarge the table  onto flip chart paper for the exercise). Write the set of preferences along the top row of the table and in the  column with heading ‘item’. For each pair of preferences, ask the participants to choose which is the most  important to the community (more favoured preference) and to give reasons for their choice eg. Health care vs.  education. Mark down how many responses there are from the group for each preference in the column heading  ‘score’ in the pairwise ranking matrix. Present a different pair and repeat the comparison until all the boxes  49 under ‘score’ are filled. Then rank the scores, so that the preference with the highest score is ranked A, and so on.  F igure A1 gives an example of pairwise ranking for reference.   Matrix ranking :this exercise identifies the reasons for local preferences as defined above by ranking them  against particular criteria. Discuss with the participants what criteria are important to them with regard to  accessing indicators of social benefits (ie. Cost, availability, time, distance etc). Use the set of preferences  identified in the preference ranking to fill in the table given in Figure A2 (enlarge the table onto flip chart paper  for the exercise). Write the set of preferences along the left hand column of the table, and write the set of criteria  along the top row. Ask the participants to choose which criteria is most important for each preference, and give  each criteria a score (rank criteria from best to worst – if there are 10 preferences, 1 = worst and 10 = best).  Repeat for each set of preferences and criteria, and then rank the scores, so that the criteria with the highest score  is ranked A, and so on. Figure A2 gives an example of matrix ranking for reference.     This ranking exercise should be accompanied by in-depth discussion of the issues, and at the end of the exercise  there should be consensus amongst the group as to the ‘preference’ and ‘criteria’ which are most important to  the community.   At the end of the session, make sure that the group are in agreement as to the ‘preference’ and ‘criteria’ which  are most important to the community.   Keep a clear record of the ranking matrix tables and any discussion that accompanied them.    QUESTION 10   Finally, ask the groups what transport improvements the community would suggest for the area, with reasons,  and whether they have mobilised the community to undertake their own road maintenance in the past, or  whether they would consider doing so in the future.    PLEASE THANK THE INTERVIEWEE FOR GIVING UP THEIR TIME TO ANSWER YOUR QUESTIONS  50 FIGURE A1: PAIRWISE RANKING EXAMPLE – PREFERENCE OF TRANSPORT MODE Walking (Preference 1) Bicycle (Preference 2) Ox-cart (Preference 3) Bus (Preference 4) Car (Preference 5) ITEM SCORE RANK Bicycle Ox-cart BusCar Walking (Preference 1) 0E Ox-cart Bicycle Car Bicycle (Preference 2) 2C Ox-cart Car Ox-cart (Preference 3) 3B Car Bus (Preference 4) 1D Car (Preference 5) 4A 51 FIGURE A2: MATRIX RANKING EXAMPLE – PREFERENCE OF TRANSPORT MODE CRITERIA/ ITEM Cost (Criteria 1) Energy (Criteria 2) Time (Criteria 3) Distance (Criteria 4) Comfort (Criteria 5) TOTALSCORE RANK Walking (Preference 1) 5 1 111 9 E Bicycle (Preference 2) 42 322 13 D Ox-cart (Preference 3) 33 233 14 C Bus (Preference 4) 24 444 18 B Car (Preference 5) 15 555 21 A 1 = worst criteria 5 = best criteria 52 EXAMPLE QUESTION GIVEN IN FOCUS GROUP DISCUSSIONS     7)  Describe the effect of the transport intervention on people’s mobility (by income  group)    Rating:   -2 very bad effect  -1 bad effect  0 no effect  1 some improvement  2 very good improvement    Mobility Effect  Wealthy  Medium  Poor  Comments  Mobility Benefits  a) Frequency of transport    b) Reliability of transport    c) Accessibility of place    d) Cost of transport    e) Distance    f) Speed    g) Safety    53 Social Benefits  Wealthy  Medium  Poor  Comments  h) Livelihood Enhancing  (specify)    i) Life Prolonging – health  (specify)    j) Life Enhancing –  education/human capital    k) Socially Enhancing  (specify)    54 Appendix 3 – Questionnaire B: Household questionnaire survey  55 56 57 58 59 60 61 62 Appendix 4 – Mapping and Ranking Exercises    63 EXAMPLES OF MAPPING AND RANKING EXERCISES    Social / Resource mapping:  Maps can be used to identify the comparative location and  importance of different resources within an area. Social maps can be used to locate land-use,  houses, services and infrastructure within an area. Maps can be used as a visual stimulant, to  identify the parameters faced by local people and to facilitate discussion about the importance  people place on infrastructure and transport service provision etc.    Ranking and scoring techniques:  Used to assess people's expectations, beliefs, attitudes,  preferences and opinions. Ranking and scoring means placing something in order:   Ranking: putting in order   Scoring: weighting differences    A useful tool to be used in generating basic information which helps to focus further questioning.  In a transport context, ranking and scoring techniques are useful for obtaining information such as  journey origin and destination, journey mode, journey purpose, frequency and cost etc.    Matrix ranking:  Matrix ranking involves listing key criteria (which have been predetermined by  the community) down one side of a matrix table, and the measure by which they are judged,  gained from informal discussion or pairwise ranking, across the top. Each element is then  considered in terms of each criteria and a score is given on the basis of each criteria. This method  can be undertaken to establish local perceptions of efficiency for different transport modes in  relation to their cost, frequency, availability, energy and time consumption.    Wealth ranking:  Wealth ranking enables villagers to divide households in the community  according to economic and other 'well-being' categories including animal ownership, type of  house, size of family, farm size and bicycle or ox-cart ownership etc. This helps identify target  group members for projects, specifically the poorest sections of a society. Differences in wealth  and well-being affect peoples’ perceptions and coping strategies. It is important to understand this  prior to further appraisal or planning.  Source: National Environmental Secretariat (1990) 64 A 4 Car(Preference 5) D 1 Bus(Preference 4) Car B 3 Ox-cart(Preference 3) Car O x-cart C 2 Bicycle (Preference 2) Car B icycle O x-cart E 0 Walking(Preference 1) Car B us O x-cart B icycle RANK S CORE  I TEM Car(Preference 5) Bus(Preference 4) Ox-cart(Preference 3) Bicycle(Preference 2) Walking(Preference 1) A 4 Car(Preference 5) D 1 Bus(Preference 4) Car B 3 Ox-cart(Preference 3) Car O x-cart C 2 Bicycle (Preference 2) Car B icycle O x-cart E 0 Walking(Preference 1) Car B us O x-cart B icycle RANK S CORE  I TEM Car(Preference 5) Bus(Preference 4) Ox-cart(Preference 3) Bicycle(Preference 2) Walking(Preference 1) Mobility charts :a tool utilised for discerning trip distance, destination, frequency and modal  choice of daily income and non-income earning activities presented in a schematic diagram. The  chart can be drawn as a spider diagram, with participants drawing arrows from their ‘household’  at the centre of the diagram in varying thickness and colour to denote frequency of trips and  different transport modes respectively. The arrow points towards a drawing, which represents a  particular activity for which the journey has been made.    M atrix Ranking  Pairwise Ranking  Source: ActionAid (1992) 65 WEB-BASED TOOLS FOR PARTICIPATORY APPROACHES    http ://www.fao.org/Participation/ft_princ.jsp http://www.worldbank.org/participation/tools&methods/partmethods.htm http://www.chronicpoverty.org/CPToolbox/Index.htm http://www.eldis.org/manuals/toolspart.htm http://www.ids.ac.uk/ids/particip